FireDOC Search

Author
Staffo, G. T.
Title
Preliminary Hazard Analysis Application to Facilities Acquisition.
Coporate
Naval Facilities Engineering Command, Alexandria, VA
Book or Conf
National Institute of Building Sciences. International Conference on Building Use and Safety Technology. March 12-14, 1985, Los Angeles, CA, 179-183 p., 1985
Keywords
hazard analysis | safety
Abstract
The use of system safety on facilities requires that a Preliminary Hazard Analysis (PHA) be conducted prior to design, during the planning phase, of the facilities acquisition process. Traditional PHA methods are not tailored to facilities acquisition and have not been easily grasped and applied by professional engineers, planners, and/or architects who have little or no system safety education and experience background. The purpose of this article is to introduce a basic methodology for conducting a PHA for a facility that may be more easily understood by these professionals involved in the facilities acquisition process. The PHA is the foundation cornerstone for system safety application to facilities acquisition.