history of the process of building commissioning; identification of available resources; general guidelines targeted to fire protection engineers; National Institute of Building Sciences (NIBS); owner requirements; commissioning plan; documentation; predesign phase; Authority Having Jurisdiction (AHJ); key objectives during the design process; key elements during the construction phase; occupancy and operations phase