FireDOC Search

Author
Construction Industry Institute
Title
Project Delivery Systems: CM at Risk, Design-Build, Design-Bid-Build.
Coporate
Construction Industry Institute, Austin, TX
Report
Research Summary 133-1, December 1997, 36 p.
Distribution
For more information contact: Construction Industry, Institute, University of Texas at Austin, 3208 Red River Street, Suite 300, Austin, TX 78705. Telephone: 512-232-3000, Fax: 512-499-8108, Email: info@construction-institute.org Website: http://construction-institute.org
Keywords
construction
Abstract
Design-Build: it is the nomenclature for a project delivery system that runs the gamut, from organizations employing it regularly, to those who tolerate it occasionally, to organizations restricted by statute from embracing it, to many who have never confronted it. Comparing its success to two other widely used delivery methods, design-bid-build and and construction management (CM) at risk, was the charter of this research team. The results - proven by statistical analysis on over 350 projects - are "rock solid."