- Author
-
Ibbs, C. W.
|
Back, W. E.
|
Kim, J. J.
|
Wall, D. E.
|
DeLaGarza, J. M.
|
Hassanein, M. A.
|
Schran, S. M.
|
Twardock, R. K.
- Title
- Determining the Impact of Various Construction Contract Types and Clauses on Project Performance. Volume 2. Appendices.
- Coporate
- University of Illinois, Urbana-Champaign
- Sponsor
- National Science Foundation, Washington, DC
- Report
-
Source Document 11; Task Force 83-5
April 1986
231 p.
- Contract
- NSF-GRANT-MSM-84-51561
- Keywords
-
construction
|
questionnaires
|
statistical analysis
- Identifiers
- general clause and project performance analysis; analysis of different clause families; analysis of contract types; owners vs contractors; contractural allocation of risk
- Abstract
- This research report is comprised of two volumes, of which this is the second. The study questionnaire (Appendix A) and the computer-analyzed data (Appendix B) are contained within, and will be important sources of more detailed information for especially interested readers. Appendix A is straightforward and is discussed extensively in Chapter 3 of Volume 1. Appendix B is more involved, containing the results of various statistical analyses as outlined in Chapter 3. Briefly, the order of presentation can be understood as follows. The data related on pages B-1 to B-144 are criteria test results used throughout the research, especially for Chapters 4-8. Note that the results for each such p-test carry over onto two pages. The heading at the top of a page shows the tested criteria (e.g., clarification necessary) and the subcategory (all respondents, owners, or fixed price contracts, for instance) being presented.