FireDOC Search

Author
Halpin, D. W. | Escalona, A. L. | Szmurlo, P. M.
Title
Work Packaging for Project Control.
Coporate
Maryland Univ., College Park
Report
Source Document 28; Task Force 83-6, August 1987, 116 p.
Keywords
construction | costs | design applications
Identifiers
work packaging basics; work packaging applied to engineering; work packaging applied to procurement; work packaging applied to construction; integrating engineering procurement and construction work packaging
Abstract
To be successful in preventing cost and schedule overruns in the construction of a facility, the project must have a formal control system. The purposes of this report are to: 1. describe systems presently being used in the industry in defining work packages for control purposes during design, procurement and construction; 2. present guidelines as to application of work packaging for project control; 3. propose a framework for the integration of work packages for consistency across the design, procurement, and construction phases of a project.