FireDOC Search

Author
Reed, K. A.
Title
Role of the CIMsteel Integration Standards in Automating the Erection and Surveying of Constructional Steelwork .
Coporate
National Institute of Standards and Technology, Gaithersburg, MD
Report
NIST SP 989, September 2002,
Distribution
AVAILABLE FROM: National Technical Information Service (NTIS), Technology Administration, U.S. Department of Commerce, Springfield, VA 22161. Telephone: 1-800-553-6847 or 703-605-6000; Fax: 703-605-6900; Rush Service (Telephone Orders Only) 800-553-6847; Website: http://www.ntis.gov AVAILABLE FROM Superintendent of Documents, U.S. Government Printing Office, Mail Stop SSOP, Washington, DC 20402-0001. Telephone: 202-512-1800. Fax: 202-512-2250. Website: http://www.bookstore.gpo.gov
Book or Conf
International Symposium on Automation and Robotics in Construction, 19th (ISARC). Proceedings. National Institute of Standards and Technology, Gaithersburg, Maryland. September 23-25, 2002, 15-20 p., 2002
Keywords
robotics | steel structures | steels | building construction
Identifiers
automated construction; integration; product data model; project delivery; structural steelwork
Abstract
The second release of the CIMsteel Integration Standards (CIS/2) has been endorsed by the American Institute of Steel Construction as the standard for the electronic exchange of structural steel project information for the North American steel design and construction industry. Derived from the deliverables and experiences of the Pan-European Eureka CIMsteel Project and published by the Steel Construction Institute in the UK, the CIS/2 was developed with a life-cycle view of structural steelwork information in mind. However, the primary focus of both developers and implementers of CIS/2 has been on the pre-construction processes of design, analysis, detailing, and shop fabrication. This paper examines the applicability of CIS/2 to on-site construction processes, focusing on automating the erection and surveying of structural steelwork and integrating these two processes into the overall project delivery system.