displaying 1 - 10 results in total 20
Sheinson, R. S.; Eaton, H. G.; Black, B. H.; Brown, R.; Burchell, H.; Salmon, G.; St. Aubin, J.; Smith, W. D.
view article (1.0)Total Flooding Fire Suppressant Testing in a 56 m³ (200 ft³) Compartment.Naval Research Laboratory, Washington, DCHalon Alternatives Technical Working Conference 1993. Proceedings. HOTWC 1993. (Halon Options Technical Working Conference.) University of New Mexico; New Mexico Engineering Research Institute; Center for Global Environmental Technologies; National Association of Fire Equipment Distributors, Inc.; Halon Alternative Research Corp.; Fire Suppression Systems Assoc.; and Hughes Associates, Inc. May 11-13, 1993, Albuquerque, NM, 137-148 p., 1993Black, B. H.; Sheinson, R. S.; Maranghides, A.; Friderichs, T. J.; Peatross, M. J.; Smith, W. D.
view article (1.0)Real Scale Halon Replacement Testing Aboard the ex-USS SHADWELL.Naval Research Laboratory, Washington, DCNational Institute of Standards and Technology (NIST) and Society of Fire Protection Engineers (SFPE). International Conference on Fire Research and Engineering (ICFRE). Proceedings. September 10-15, 1995, SFPE, Boston, MA, Orlando, FL, Lund, D. P.; Angell, E. A., Editors, 82-87 p., 1995Maranghides, A.; Sheinson, R. S.; Black, B. H.; Friderichs, T. J.; Peatross, M.; Smith, W. D.
view article (1.0)Agent Concentration Inhomogeneities and Dilution Due to Nitrogen in Real Scale Halon Replacement Testing.Naval Research Laboratory, Washington, DC; GEO-CENTERS, Inc., Fort Washington, MD; MPR Associates, Inc., Alexandria, VA; Hughes Associates, Inc., Columbia, MDNational Institute of Standards and Technology (NIST) and Society of Fire Protection Engineers (SFPE). International Conference on Fire Research and Engineering (ICFRE). Proceedings. September 10-15, 1995, SFPE, Boston, MA, Orlando, FL, Lund, D. P.; Angell, E. A., Editors, 119-124 p., 1995Maranghides, A.; Sheinson, R. S.; Black, B. H.; Smith, W. D.
view article (1.0)Effects of Fire Size on Extinguishment Time and Acid Byproducts During Real Scale Halon Replacement Testing.Naval Research Laboratory, Washington, DC; GEO-CENTERS, Inc., Fort Washington, MDNaval Sea Systems Command, Washington, DC,Combustion Institute/Eastern States Section. Chemical and Physical Processes in Combustion. Proceedings. Fall Technical Meeting, 1995. October 16-18, 1995, Worcester, MA, 195-198 p., 1995Sheinson, R. S.; Maranghides, A.; Black, B. H.; Friderichs, T.; Peatross, M.; Smith, W. D.
view article (1.0)Halon Replacement Considerations for Shipboard Machinery Spaces.Naval Research Laboratory, Washington, DCProduct Safety Corporation. International Conference on Fire Safety, 20th. Volume 20. Proceedings. January 9-13, 1995, Product Safety Corp., Sunnyvale, CA, Millbrae, CA, 112-119 p., 1995Sheinson, R. S.; Maranghides, A.; Black, B. H.; Friderichs, T.; Peatross, M.; Smith, W. D.
view article (1.0)From Halon 1301 to a Replacement Agent: Integrated Development of a Fire Protection System.Naval Research Laboratory, Washington, DCInterscience Communications Ltd.; National Institute of Standards and Technology; Building Research Establishment; and Society of Fire Protection Engineers; Swedish National Testing and Research Institute. Interflam '96. International Interflam Conference, 7th Proceedings. March 26-28, 1996, Interscience Communications Ltd., London, England, Cambridge, England, Franks, C. A.; Grayson, S., Editors, 459-466 p., 1996Shenison, R. S.; Maranghides, A.; Barylski, D.; Black, B. H.; Brown, R.; Burchell, H.; Byrne, P.; Eaton, H. G.; Friderichs, T.; Mitchell, C.; Peatross, M.; Salmon, G.; Smith, W. D.; Williams, F. W.
view article (1.0)Intermediate (56 m³) and Full Scale (840 m³) HFC Total Flooding Fire Extinguishment Results.Naval Research Laboratory, Washington, DCInterscience Communications Ltd.; National Institute of Standards and Technology; Building Research Establishment; and Society of Fire Protection Engineers; Swedish National Testing and Research Institute. Interflam '96. International Interflam Conference, 7th Proceedings. March 26-28, 1996, Interscience Communications Ltd., London, England, Cambridge, England, Franks, C. A.; Grayson, S., Editors, 901-906 p., 1996Maranghides, A.; Sheinson, R. S.; Black, B. H.
view article (1.0)Flammable Liquid Storeroom Halon Replacement Testing.GEO-Centers, Inc., Fort Washington, MD; Naval Research Laboratory, Washington, DCNISTIR 5904, October 1996,National Institute of Standards and Technology. Annual Conference on Fire Research: Book of Abstracts. October 28-31, 1996, Gaithersburg, MD, 47-48 p., 1996Black, B. H.; Maranghides, A.; Sheinson, R. S.; Peatross, M. J.; Smith, W. D.
view article (1.0)Real Scale Halon Replacement Testing Aboard the ex-USS SHADWELL: Phase 2. Post Fire Suppression Compartment Characterization.Naval Research Laboratory, Washington, DC; GEO-Centers, Inc., Ft. Washington,MD; Hughes Associates, Inc., Baltimore, MDNRL/MR/6180-97-7939; Phase 2, April 14, 1997, 20 p.Halon Options Technical Working Conference. Proceedings. HOTWC 1996. Sponsored by: University of New Mexico, Halon Alternative Research Corp., National Association of Fire Equipment Distributors, Inc., Hughes Associates, Inc., and Kidde International. May 7-9, 1996, Albuquerque, NM, 423-434 p., ['1997', '1996']Maranghides, A.; Sheinson, R. S.; Black, B. H.; Peatross, M. J.; Smith, W. D.
view article (1.0)Effects of a Water Spray Cooling System During Real Scale Halon 1301 Replacement Testing on Post Fire Suppression Compartment Reclamation.Naval Research Laboratory, Washington, DC; GEO-Centers, Inc., Ft. Washington,MD; Hughes Associates, Inc., Baltimore, MDNRL/MR/6180-97-7938, April 14, 1997, 18 p.Halon Options Technical Working Conference. Proceedings. HOTWC 1996. Sponsored by: University of New Mexico, Halon Alternative Research Corp., National Association of Fire Equipment Distributors, Inc., Hughes Associates, Inc., and Kidde International. May 7-9, 1996, Albuquerque, NM, 435-446 p., ['1997', '1996']