displaying 1 - 10 results in total 20
Welch, S.; Miles, S.; Kumar, S.; Lemaire, T.; Chan, A.
view article (1.0)FIRESTRUC: Integrating Advanced Three-Dimensional Modeling Methodologies for Predicting Thermo-mechanical Behaviour of Steel and Composite Structures Subjected to Natural Fires.Edinburgh Univ., Scotland; Building Research Establishment, Garston, England; TNO Efectis, Delft, NetherlandsFire Safety Science. Proceedings. Ninth (9th) International Symposium. International Association for Fire Safety Science (IAFSS). September 21-26, 2008, Intl. Assoc. for Fire Safety Science, Boston, MA, Karlsruhe, Germany, Karlsson, B., Editors, 1315-1326 p., 2008Miles, S.; Kumar, S.; Cox, G.
view article (1.0)Balcony Spill Plume: Some CFD Simulations.Fire Research Station, Garston, EnglandInternational Association for Fire Safety Science. Fire Safety Science. Proceedings. Fifth (5th) International Symposium. March 3-7, 1997, Intl. Assoc. for Fire Safety Science, Boston, MA, Melbourne, Australia, Hasemi, Y., Editors, 237-247 p., 1997Miles, S.
view article (1.0)Complex Smoke Control Issues and the Role of CFD.Fire Safety Engineering, Vol. 6, No. 6, 12-15, December 1999Miles, S.
view article (1.0)Simulations Using JASMINE and CFAST. Benchmark Analysis With JASMINE AND CFAST. Appendix G.Building Research Establishment, Garston, EnglandNISTIR 6872, June 2002,International Collaborative Project to Evaluate Fire Models for Nuclear Power Plant Applications. Evaluation of Fire Models for Nuclear Power Plant Applications: Cable Tray Fires. International Panel Report. Appendix G: Benchmark Analysis With JASMINE and CFAST, G/1-24 p., 2002Westbury, P.; Miles, S.
view article (1.0)Wind Tunnel Testing or CFD: Are You Using the Right Tool?Constructing the Future, No. 13, 9-10, Summer 2002Harrison, R.; Miles, S.
view article (1.0)Smoke Ventilation of Fire Fighting Shafts.Fire Safety Engineering, Vol. 10, No. 1, 16-17, January 2003Dey, M. K.; Hamins, A.; Miles, S.
view article (1.0)International Collaborative Project to Evaluate Fire Models for Nuclear Power Plant Applications: Summary of 5th Meeting.Nuclear Regulatory Commission, Washington, DC; National Institute of Standards and Technology, Gaithersburg, MD; Building Research Establishment, Garston, EnglandNISTIR 6986, September 2003, 569 p.International Collaborative Project to Evaluate Fire Models for Nuclear Power Plant Applications: Summary of 5th Meeting. May 2-3, 2002, Gaithersburg, MD, 2003Miles, S.
view article (1.0)Preliminary Results for Benchmark Exercise #2 Using CFAST and JASMINE.Building Research Establishment, Garston, EnglandNISTIR 6986, September 2003, 569 p.International Collaborative Project to Evaluate Fire Models for Nuclear Power Plant Applications: Summary of 5th Meeting. APPENDIX C. SUMMARY PAPERS: Preliminary Results of Benchmark Exercise #2, Part 1, Evaluation of Fire Models for Nuclear Facility Applications. C/161-163 pp and APPENDIX D. VIEW GRAPHS USED FOR PRESENTATIONS. D/275-286 pp. May 2-3, 2002, Gaithersburg, MD, 2003Miles, S.
view article (1.0)Fire in a Large Hall. Benchmark Analysis #2. Specification for Part 1.NISTIR 6986, September 2003, 569 p.International Collaborative Project to Evaluate Fire Models for Nuclear Power Plant Applications: Summary of 5th Meeting. APPENDIX D. View Graphs Used for Presentations: Preliminary Results of Behchmark Exercise #2, Part 1, Evaluation of Fire Models for Nuclear Facility. May 2-3, 2002, Gaithersburg, MD, D/189-192 p., 2003Miles, S.
view article (1.0)Fire in a Large Hall. Benchmark Analysis #2. Proposal for Part 2.NISTIR 6986, September 2003, 569 p.International Collaborative Project to Evaluate Fire Models for Nuclear Power Plant Applications: Summary of 5th Meeting. APPENDIX D. View Graphs Used for Presentations: Preliminary Results of Behchmark Exercise #2, Part 1, Evaluation of fire Models for Nuclear Facility. May 2-3, 2002, Gaithersburg, MD, D/287-289 p., 2003