FireDOC Search

displaying 1 - 4 results in total 4

  • Lew, H. S.; Fattal, S. G.; Shaver, J. R.; Reinhold, T. A.; Hunt, B. J.
    view article (1.0)

    Investigation of Construction Failure of Reinforced Concrete Cooling Tower at Willow Island, WV. Final Report.
    National Bureau of Standards (NEL), Washington, DC
    Department of Labor, Washington, DC, NBS BSS 148, September 1982,

  • Lew, H. S.; Fattal, S. G.; Shaver, J. R.; Reinhold, T. A.; Hunt, B. J.
    view article (1.0)

    Investigation of Construction Failure of Reinforced Concrete Cooling Tower at Willow Island, West Virginia. Final Report.
    National Bureau of Standards, Washington, DC
    Occupational Safety and Health Administration, Washington, DC, NBSIR 78-1578, November 1979,

  • Cattaneo, L.; Harris, J. R.; Reinhold, T. A.; Simiu, E.; Yancey, C. W. C.
    view article (1.0)

    Wind, Earthquake, Snow, and Hail Loads on Solar Collectors.
    National Bureau of Standards, Washington, DC
    Department of Energy, Washington, DC, NBSIR 81-2199, January 1981,

  • Reinhold, T. A.; Yokel, F. Y.; Rudder, F. F.
    view article (1.0)

    Investigation of Floor Vibrations in the 'D' Wing of the Main Building of the Bureau of Engraving and Printing.
    National Bureau of Standards, Washington, DC
    Bureau of Engraving and Printing, Washington, DC, NBSIR 82-2599, December 1982,