FireDOC Search

displaying 1 - 4 results in total 4

  • Lew, H. S.; Fattal, S. G.; Shaver, J. R.; Reinhold, T. A.; Hunt, B. J.
    view article (1.0)

    Investigation of Construction Failure of Reinforced Concrete Cooling Tower at Willow Island, WV. Final Report.
    National Bureau of Standards (NEL), Washington, DC
    NBS BSS 148
    Department of Labor, Washington, DC, NBS BSS 148
    September 1982

  • Lew, H. S.; Fattal, S. G.; Shaver, J. R.; Reinhold, T. A.; Hunt, B. J.
    view article (1.0)

    Investigation of Construction Failure of Reinforced Concrete Cooling Tower at Willow Island, West Virginia. Final Report.
    National Bureau of Standards, Washington, DC
    NBSIR 78-1578
    Occupational Safety and Health Administration, Washington, DC, NBSIR 78-1578
    November 1979

  • Cattaneo, L.; Harris, J. R.; Reinhold, T. A.; Simiu, E.; Yancey, C. W. C.
    view article (1.0)

    Wind, Earthquake, Snow, and Hail Loads on Solar Collectors.
    National Bureau of Standards, Washington, DC
    NBSIR 81-2199
    Department of Energy, Washington, DC, NBSIR 81-2199
    January 1981

  • Reinhold, T. A.; Yokel, F. Y.; Rudder, F. F.
    view article (1.0)

    Investigation of Floor Vibrations in the 'D' Wing of the Main Building of the Bureau of Engraving and Printing.
    National Bureau of Standards, Washington, DC
    NBSIR 82-2599
    Bureau of Engraving and Printing, Washington, DC, NBSIR 82-2599
    December 1982