displaying 1 - 10 results in total 15
Beene, D. E.; Richards, R. C.
view article (1.0)Automated Deck Foam Fire Extinguishing Systems for Tankers. Final Report.Coast Guard, Groton, CTUSCG-D-51-77, April 1977, 64 p.Richards, R. C.; Munkenbeck, G. J.
view article (1.0)Fire Exposure Tests of Polyethylene and Fifty-Five Gallon Steel Drums Loaded With Flammable Liquids. Phase 2. Final Report.Coast Guard Research and Development Center, Groton, CTDepartment of Transportation, Washington, DC, DOT/MTB/OHMO-77/3; CG-D-86-77; CGR&DC 20/77, August 1977, 98 p.Richards, R. C.; White, K. T.
view article (1.0)Fire Exposure Tests of Polyethylene and Fifty-Five Gallon Steel Drums Loaded With Flammable Liquids. Phase 1. Final Report.Coast Guard, Mobile, ALCGR/DC-16/76, September 1976, 145 p.Richards, R. C.
view article (1.0)Fire Safety Analysis of the Polar Icebreaker Replacement Design. Volume 1. Final Report.Coast Guard, Groton, CTCoast Guard, Washington, DC, USCG-M-04-88-Vol-1; USCG-MFSRS-63-Vol-1, October 1987, 170 p.Richards, R. C.
view article (1.0)Fire Safety Analysis of the Polar Icebreaker Replacement Design. Volume 3. Part 1. Final Report.Coast Guard, Groton, CTCoast Guard, Washington, DC, USCG-M-04-88-Vol-3-Pt-1; USCG-MFSRS-63-Vol-3-Pt-1, October 1987, 282 p.Richards, R. C.
view article (1.0)Fire Safety Analysis of the Polar Icebreaker Replacement Design. Volume 3. Part 2. Final Report.Coast Guard, Groton, CTCoast Guard, Washington, DC, USCG-M-04-88-Vol-3-Pt-2; USCG-MFSRS-63-Vol-3-Pt-2, October 1987, 386 p.Richards, R. C.
view article (1.0)Fire Safety Analysis of the Polar Icebreaker Replacement Design. Volume 2. Final Report.Coast Guard, Groton, CTCoast Guard, Washington, DC, USCG-M-04-88-Vol-2; USCG-MFSRS-63-Vol-2, October 1987, 313 p.Richards, R. C.
view article (1.0)High Expansion Foam Extinguishment of Machinery Space Fires. Final Report.Coast Guard, Mobile, ALCG-D-83-76, December 1975, 62 p.Richards, R. C.; Vorthman, R. G.
view article (1.0)Full Scale Ship's Hull Exposure Fire Tests. Final Report.Coast Guard, Mobile, ALUSCG-D-97-76, June 1976, 49 p.Richards, R. C.
view article (1.0)Development of Explosion Suppression System Requirements for Shipboard Pump Rooms. Final Report.Coast Guard, Groton, CTUSCG-D-79-76; CGR/DC-2/76, January 1976, 90 p.