Zhao, L. D.
view article (9.993612)
Using Risk-Based Time Method to Determine the Maximum Travel Distance for Building Design.
Ove Arup and Partners Hong Kong Limited, Kowloon Tong
International Journal on Engineering Performance-Based Fire Codes,
Vol. 2,
No. 3,
81-89,
2000