displaying 1 - 10 results in total 60
Bukowski, R. W.
view article (1.0)Toxic Hazard Evaluation of Plenum Cables.National Bureau of Standards, Gaithersburg, MDFire Technology, Vol. 21, No. 4, 252-266, November 1985UJNR Panel on Fire Research and Safety. 8th Joint Panel Meeting. May 13-21, 1985, Tsukuba, Japan, 964-987 p., 1985Backovsky, J.; Foote, K. L.; Alvares, J.
view article (1.0)Temperature Profiles in Forced-Ventilation Enclosure Fires.Lawrence Livermore National Lab., CAno date, 10 p.U.S./Japan Government Cooperative Program on Natural Resources (UJNR). Fire Research and Safety. 10th Joint Panel Meeting. June 9-10, 1988, Tsukuba, Japan, 125-126 pp, 1988 AND International Association for Fire Safety Science. Fire Safety Science. Proceedings. 2nd International Symposium. June 13-17, 1988, TH9112.F5626 1989, Tokyo, Japan, Hemisphere Publishing Corp., New York, Wakamatsu, T., Hasemi, Y., Sekizawa, A., Seeger, P. G., Pagni, P. J. and Grant, C. E. Editor(s), 315-324 pp, 1989, 1989O'Brien, D.
view article (1.0)Wire and Cable for the Plenum: A Challenge to Industry.Belden Corp., Chicago, ILFire Retardant Chemicals Association. Flame Retardant Needs of the Future. Building and Construction. Joint Meeting. October 5-8, 1980., Fire Retardant Chemicals Assoc., Westport, CT, Ponte Vedra Beach, FL, 67-80 p., 1980Hirschler, M. M.
view article (1.0)First Order Evaluation of Fire Hazard in a Room Due to the Burning of Poly(Vinyl Chloride) Products in a Plenum: Estimation of the Time Required to Establish an Untenable Atmosphere.Goodrich (B. F.) Co., Avon Lake, OHJournal of Fire Sciences, Vol. 6, No. 2, 100-120, March/April 1988U.S. Army Communications Electronics Command (CECOM)
view article (1.0)Army Communications Electronics Command, Fort Monmouth, NJU.S. Army Communications Electronics Command (CECOM). International Wire and Cable Symposium, 30th. November 17-19, 1981, Cherry Hill, NJ, 474 p., 1981Arroyo, C. J.; Cogelia, N. J.; Darsey, R. J.
view article (1.0)Thermal Behavior of Experimental Plenum Cable Sheaths Determined in a Radiant Heat Chamber.Bell Labs., Norcross, GA; Western Electric Co., Norcross, GAU.S. Army Communications Electronics Command (CECOM). International Wire and Cable Symposium, 30th. November 17-19, 1981, Cherry Hill, NJ, 87-98 p., 1981Underwriters Laboratories, Incorporated
view article (1.0)Fire Test of Pneumatic Tubing for Flame and Smoke Characteristics.Underwriters Labs., Inc., Northbrook, ILUL 1820, March 13, 1989, 16 p.Underwriters Laboratories, Incorporated
view article (1.0)Fire Test of Plastic Sprinkler Pipe for Flame and Smoke Characteristics.Underwriters Labs., Inc., Northbrook, ILUL 1887, January 31, 1989, 15 p.Degenkolb, J. G.
view article (1.0)Plenums and the National Electrical Code.Code Consultant, Carson City, NVBuilding Official and Code Administrator, Vol. 24, No. 2, 17-20, March/April 1990Gallagher, R. M.; Wadehra, I.
view article (1.0)Comparison of Flame Propagation and Smoke Development From Cables Installed in a Simulated Plenum and Modified UL-910 Test.IBM Corp., Poughkeepsie, NY; IBM Corp., Raleigh, NCInternational Conference on Fire Safety, 13th. Volume 13. January 11-15, 1988, Product Safety Corp., Sunnyvale, CA, Millbrae, CA, 256-272 p., 1988