Sanders, P. A.; Collins, B. L.
view article (10.004545)
Post-Occupancy Evaluation of the Forrestal Building. January 1993-December 1994.
National Institute of Standards and Technology, Gaithersburg, MD
Department of Energy, Washington, DC,
NISTIR 5591,
March 1995,
67 p.
Rubin, A. I.
view article (9.9981365)
Post Occupancy Evaluation of Federal Buildings: The Portland Federal Building and Others.
National Institute of Standards and Technology, Gaithersburg, MD
General Services Administration, Washington, DC,
NISTIR 4307,
April 1990,
178 p.
Collins, B. L.; Fisher, W.; Gillette, G.; Marans, R. W.
view article (9.993612)
Second-Level Post-Occupancy Evaluation Analysis.
National Institute of Standards and Technology, Gaithersburg, MD; Lighting Research Institute; Michigan Univ., East Lansing
Journal of the Illuminating Engineering Society,
Vol. 19,
21-44,
Summer 1990