FireDOC Search

displaying 1 - 5 results in total 5

  • Baker, E. H.; Griffin, J. L.; Higginbottom, R. W.; Goldberg, H. D.
    view article (1.0)

    Comparative Performance of Electrical Conduit Under Conditions of Internal Arcing. Summary Report. Tests Conducted by Kearney Company, Electrical Research Lab., McCook, Illinois.
    Picoma Industries, Inc.; Wheatland Tube Co.; Triangle PWC, Inc.; Allied Tube and Conduit Corp.
    Steel Conduit and EMT Manufacturers, Washington, DC, M-1143, November 1981, 15 p.

  • Baker, E. H.; Griffin, J. L.; Higginbottom, R. W.
    view article (1.0)

    Physical Testing on Electrical Conduit. Summary Report. Tests Conducted by Pittsburgh Testing Lab.
    Picoma Industries, Inc.; Wheatland Tube Co.; Triangle PWC, Inc.
    Steel Conduit and EMT Manufacturers, Washington, DC, 822738; P.G. 17948, November 1981, 17 p.

  • Zicherman, J. B.
    view article (1.0)

    Standard Building Code and Fire Safety of PVC Raceways.
    IFT Technical Services, Inc., Berkeley, CA
    Carlon, Cleveland, OH, IFT 86-38B, November 1989, 85 p.

  • Zicherman, J. B.
    view article (1.0)

    Basic/National (BOCA) Building Code and Fire Safety of PVC Raceways.
    IFT Technical Services, Inc., Berkeley, CA
    Carlon, Cleveland, OH, IFT 86-38B, November 1989, 82 p.

  • Steckler, K. D.
    view article (1.0)

    Pilot-Scale Fire-Endurance Tests of Fire-Barrier Panels and Panel/Blanket Combinations. Report of Test.
    National Institute of Standards and Technology, Gaithersburg, MD
    FR 4008; Report of Test FR 4008, August 20, 1996, 158 p.