FireDOC Search

displaying 1 - 10 results in total 93

  • Bukowski, R. W.
    view article (1.0)

    Fire Protection Systems for Rail Transportation of Class A Explosives. Interim Report.
    National Bureau of Standards, Gaithersburg, MD
    Department of Transportation, Washington, DC, NBSIR 80-2170, November 1980, 30 p.

  • Smith, D. A.
    view article (1.0)

    Some Aspects of Fire Safety Design on Railways.
    Fire and Materials, Vol. 8, No. 1, 6-9, 1984

  • view article (1.0)

    Fire Brigade Assists at Railway Accident.
    Fire International, No. 80, 39-45, March-April 1983

  • Fire International
    view article (1.0)

    Moorgate After Seven Years: A Major Disaster Recalled.
    Fire International, No. 76, 69-71, August/September 1976

  • Fire International
    view article (1.0)

    Near-Disaster on Underground Railway.
    Fire International, No. 76, 67-68, August/September 1982

  • Fire International
    view article (1.0)

    Lessons Learned From the Mississauga Disaster.
    Fire International, No. 70, 64-68, March 1981

  • Office of Technology Assessment
    view article (1.0)

    Evaluation of Railroad Safety.
    Office of Technology Assessment, Washington, DC
    OTA-T-61, May 1978, 235 p.

  • Reilly, M. J.; Jines, R. H.; Tanner, A. E.
    view article (1.0)

    Rail Safety/Equipment Crashworthiness. Volume 1. A Systems Analysis of Injury Minimization in Rail Systems. Interim Report. June 1974-September 1976.
    Boeing Vertol Co., Philadelphia, PA
    Department of Transportation, Washington, DC, FRA/ORD-77/73; D339-10047-1; DOT-TSC-FRA-77-15, July 1978, 266 p.

  • Reilly, M. J.; Shefrin, J.; Patrick, L. M.
    view article (1.0)

    Rail Safety/Equipment Crashworthiness. Volume 2. Design Guide. Interim Report. June 1974-September 1976.
    Boeing Vertol Co., Philadelphia, PA
    Department of Transportation, Washington, DC, FRA/ORD-77/73; D339-10022-1; DOT-TSC-FRA-77-15, July 1978, 100 p.

  • Reilly, M. J.
    view article (1.0)

    Rail Safety/Equipment Crashworthiness. Volume 3. Proposed Engineering Standards. Interim Report. June 1974-September 1976.
    Boeing Vertol Co., Philadelphia, PA
    Department of Transportation, Washington, DC, FRA/ORD-77/73; D339-10050-1; DOT-TSC-FRA-77-15, July 1978, 72 p.