FireDOC Search

displaying 91 - 100 results in total 115

  • Nug, C. N.
    view article (1.0)

    Calcination of Gypsum Plasterboard Under Fire Exposure.
    University of Canterbury, Christchurch, New Zealand
    Fire Engineering Research Report 04/6
    Fire Engineering Research Report 04/6
    May 2004
    127 p.

  • Murphy, S.
    view article (1.0)

    Hi-Impact Wallboard Poses Safety Hazards.
    Fire Engineering, Vol. 157, No. 12, 63-65, December 2004

  • Feng, M.; Wang, Y. C.
    view article (1.0)

    Experimental Study of Loaded Full-Scale Cold-Formed Thin-Walled Steel Structural Panels Under Fire Conditions.
    UMIST and University of Manchester, P.O. Box 88, Manchester M60 1QD, UK
    Fire Safety Journal, Vol. 40, No. 1, 43-63, February 2005

  • Montagna, F. C.
    view article (1.0)

    Why Do We Do That?
    New York City Fire Dept., NY
    Fire Engineering, Vol. 158, No. 9, 97-98, September 2005

  • Shaw, D.
    view article (1.0)

    Firefighter Emergency Egress Test Using Hi-Impact® Wallboard.
    Fairfax County Fire and Rescue Dept., VA
    Fire Engineering, Vol. 158, No. 12, 59-61, December 2005

  • Bentz, D. P.; Prasad, K. R.; Yang, J. C.
    view article (1.0)

    Towards a Methodology for the Characterization of Fire Resistive Materials With Respect to Thermal Performance Models.
    National Institute of Standards and Technology, Gaithersburg, MD
    Fire and Materials, Vol. 30, No. 4, 311-321, July/August 2006

  • Carnazza, B. P.
    view article (1.0)

    Will Fire Resistive Gypsum Shafts Continue to be the Best Available Option?
    International Fire Protection (IFP) Magazine, No. 28, 69-71, November 2006

  • Bittern, A.
    view article (1.0)

    Analysis of FDS Predicted Sprinkler Activation Times with Experiments.
    University of Canterbury, Christchurch, New Zealand
    Fire Engineering Research Report 04/8
    Fire Engineering Research Report 04/8
    2004
    243 p.

  • Brown, N.
    view article (1.0)

    Steelwork Partially Protected From Post-Flashover Fires In Gypsum Plasterboard Lined Compartments.
    University of Canterbury, Christchurch, New Zealand
    Fire Engineering Research Report 07/3
    Fire Engineering Research Report 07/3
    2007
    144 p.

  • Craft, S. T.; Mehaffey, J. R.; Hadjisophocleous, G.; Isgor, B.
    view article (1.0)

    Predicting the Temperature Rise in Light-Frame Wood Floor Assemblies Exposed to Fire.
    FPInnovations-Forintek Division, Canada; Carleton University, Canada
    Volume 2
    Volume 2
    Interflam 2007. (Interflam '07). International Interflam Conference, 11th Proceedings. Volume 2. September 3-5, 2007, London, England, 967-978 p., 2007