FireDOC Search

displaying 1101 - 1110 results in total 1237

  • Thomas, I.; Bruck, D.
    view article (1.0)

    Implications of New Smoke Alarm Signal Research In the Performance Based Environment.
    Victoria Univ., Melbourne, Australia
    Performance-Based Codes and Fire Safety Design Methods, 7th International Conference. Sky is the Limit. Proceedings and Case Studies. April 16-18, 2008, Society of Fire Protection Engineers, Bethesda, MD, Auckland, New Zealand, 93-103 p., 2008

  • Clarke, J.; Schulz, J.
    view article (1.0)

    Performance Based Design: Putting it Together On Site.
    Holmes Fire and Safety, Viaduct Basin, Auckland, New Zealand
    Performance-Based Codes and Fire Safety Design Methods, 7th International Conference. Sky is the Limit. Proceedings and Case Studies. April 16-18, 2008, Society of Fire Protection Engineers, Bethesda, MD, Auckland, New Zealand, 117-128 p., 2008

  • Pauls, J.
    view article (1.0)

    Performance of Means of Egress Conducting the Research Needed to Establish Realistic Expectations.
    Consulting Services Silver Spring, MD
    Performance-Based Codes and Fire Safety Design Methods, 7th International Conference. Sky is the Limit. Proceedings and Case Studies. April 16-18, 2008, Society of Fire Protection Engineers, Bethesda, MD, Auckland, New Zealand, 217-228 p., 2008

  • Johnson, P.; Gildersleeve, C.; Williams, P.
    view article (1.0)

    Road Tunnel Fire Safety: Approach to Fire Scenarios.
    Arup Fire, Melbourne, Victoria, Australia 3000
    Performance-Based Codes and Fire Safety Design Methods, 7th International Conference. Sky is the Limit. Proceedings and Case Studies. April 16-18, 2008, Society of Fire Protection Engineers, Bethesda, MD, Auckland, New Zealand, 251-262 p., 2008

  • Alexandrovski, A.; Boverman, D.
    view article (1.0)

    Fire Brigade Intervention Model in Australia: Understanding and Applying the Concepts.
    GN Consulting Pty Ltd., Eastwood NSW 2122, Australia; New South Wales Fire Brigades, Greenacre NSW 2190, Australia
    Performance-Based Codes and Fire Safety Design Methods, 7th International Conference. Sky is the Limit. Proceedings and Case Studies. April 16-18, 2008, Society of Fire Protection Engineers, Bethesda, MD, Auckland, New Zealand, 313-324 p., 2008

  • Hofmeister, C. E.; Izbicki, T.
    view article (1.0)

    Middle Ground Approach to Structural Fire Resistance Analysis.
    Rolf Jensen and Associates, Inc., Raleigh, NC; Rolf Jensen and Associates, Inc., Addison, TX
    Performance-Based Codes and Fire Safety Design Methods, 7th International Conference. Sky is the Limit. Proceedings and Case Studies. April 16-18, 2008, Society of Fire Protection Engineers, Bethesda, MD, Auckland, New Zealand, 373-383 p., 2008

  • Ng, A. K. L.
    view article (1.0)

    Risk Assessment of Transformer Fire Protection in a Typical New Zealand High-Rise Building.
    University of Canterbury, Christchurch, New Zealand
    Fire Engineering Research Report 07/6
    Fire Engineering Research Report 07/6
    June 2007
    188 p.

  • Fanella, D. A.
    view article (1.0)

    ASCE 7-05 Simplified Alternative Seismic Design Procedure.
    Klein and Hoffman Inc., Chicago, IL
    Building Safety Journal, Vol. 6, No. 3, 26-28, April/May 2008

  • Willaims, P.
    view article (1.0)

    Support Service.
    Arup Fire
    Fire Risk Management, 30-31, May 2008

  • Fontana, M.
    view article (1.0)

    Fire Engineering of Buildings: Some Aspects on the Situation in Switzerland and EuropeRecent Research at ETH Zurich.
    Institute of Structural Engineering - Steel, Timber and Composite Structures, Switzerland
    Fire Science and Technology, Vol. 26, No. 2, 67-86, 2007