Underwriters Laboratories, Incorporated
view article (6.3036156)
Outline of Investigation for Thermoplastic Sprinkler Pipe and Fittings for Fire Protection Service. Issue Number 4.
Underwriters Laboratories, Inc., Northbrook, IL
UL Subject 1821,
June 1991,
30 p.
Schard, M. P.; Vera, O. E.
view article (6.3036156)
Extrusion of Small-Diameter Polybutylene Pipe.
Witco Chemical Corp., Fairfield, NJ
Plastics Engineering,
Vol. 33,
No. 10,
45-49,
October 1977
Macneil, J.
view article (6.3036156)
Sprinkler Fears Hit Library.
Building,
Vol. 258,
No. 7827,
12,
January 21, 1994
Bobert, M.
view article (6.3036156)
Skumvatskor-Koppling mellan viskositetsdata och rorstromning. [Foam Concentrates: Correlation Between Viscosity Properties and Pipeflow.]
Swedish National Testing and Research Inst., Boras, Sweden
SP REPORT 1995:10,
1995,
57 p.
Thurston, S. J.
view article (6.3036156)
Modelling Fire Behavior of Metal Pipe Penetrations Through Concrete Walls.
Building Research Association of New Zealand, Judgeford
Study Report No. 65,
1996,
101 p.
Becker, D.
view article (6.3036156)
Is the 250-lb Limit Outdated?
Midland Automatic Sprinkler Co., North Kansas City, MO
Sprinkler Age,
Vol. 15,
No. 10,
20,22,
October 1996
Hugins, R.; Brown, P.
view article (6.3036156)
Questions Posed on Hydraulic Design.
American Fire Sprinkler Association
Sprinkler Age,
Vol. 15,
No. 10,
20,22,
October 1996
Fire Findings
view article (6.3036156)
Loose Gas Pipe Fittings: Physics Basics May Aid Your Investigation.
Fire Findings,
Vol. 5,
No. 1,
1-2,
Winter 1997
vandervoort, H. F.
view article (6.3036156)
Characteristics of Polyvinyl Chloride Conduit, Insulated Wire, and Piping in Fire Situations.
Indian Head, Inc.
Fire Journal,
Vol. 66,
No. 6,
91-94,
November 1972
Hill, S. A.; Scheffey, J. L.; Campbell, C.; Breaux, R.; Kuzma, H.; Williams, F. W.
view article (6.3036156)
Evaluation of Damage Control Tactics and Equipment. Phase 1. Baseline Tests.
Hughes Associates, Inc., Baltimore, MD; George G. Sharp, Inc., Alexandria, VA; Naval Sea Systems Command, Arlington, VAC
Chief of Naval Operations, Washington, DC,
NRL/MR/6180-96/7902; Test Series FY 1995,
December 30, 1996,
63 p.