displaying 131 - 140 results in total 5066
Durrant, C. G.
view article (1.0)Changing Role for Private Fire Brigades.Oxfordshire Fire Service, EnglandFire Prevention, No. 165, 24-25, December 1983Ramachandran, G.
view article (1.0)Stochastic Modelling of Fire Growth.Fire Research Station, Borehamwood, EnglandASTM STP 882ASTM STP 882American Society for Testing and Materials. Fire Safety: Science and Engineering. ASTM STP 882. June 26-17, 1984, Denver, CO, Harmathy, T. Z., Editors, 122-144 p., 1984Lewis, R. J.
view article (1.0)Application of Microcomputers to Fire Station Location Planning.Dillon (M. M.) Ltd., Toronto, CanadaInternational Fire Chief, Vol. 52, No. 2, 18-21, February 1986Adams, R.
view article (1.0)Dallas Dispatch Breakdown.Firehouse, Vol. 9, No. 5, 46-48, May 1984McGary, R. A.
view article (1.0)Steel and Polybutylene Provide Sprinkler System for Fire Station.Takoma Park Volunteer Fire Dept., MDFire Engineering, Vol. 138, No. 9, 45-47, September 1985Wagner, G.
view article (1.0)Old-Time Station Design. Victorian Firehouse: a Blend of Old and New.Hassinger, (H.) Architects, Moorestown, NJFirehouse, Vol. 10, No. 5, 55-56, May 1985Reynolds, C.; Pedroza, J.
view article (1.0)Fire Cover Modelling for Brigades.Home Office Fire Research and Development Group, London, England['FRDG Publication Number 6/98', 'Research Report Number 6/98']FRDG Publication Number 6/98; Research Report Number 6/98
1998
35 p.Instituto Tecnologico de Seguridad Mapfre
view article (1.0)Instrucciones Technicas de Proteccion Contra Incendios.Instituto Tecnologico de Seguridad Mapfre, Spain
1985
100 p.Smith, F.
view article (1.0)How to Improve Fire Safety in Public Houses.Fire Prevention, No. 177, 28-31, March 1985Bryan, J. L.; DiNenno, P. J.
view article (1.0)Examination and Analysis of the Dynamics of the Human Behavior in the Fire Incident at the Montgomery General Hospital on March 28, 1979.Maryland Univ., College ParkNBS GCR 80-239National Bureau of Standards, Gaithersburg, MD, NBS GCR 80-239
May 31, 1979
28 p.