FireDOC Search

displaying 141 - 150 results in total 285

  • Comella, J.
    view article (6.608105)

    Planning a Hose and Nozzle System for Effective Operations.
    Oakland Fire Dept., CA
    Fire Engineering, Vol. 156, No. 4, 67-68,70-72,74,76-78, April 2003

  • Consulting-Specifying Engineer
    view article (6.608105)

    Unusual Sprinkler Hose Lends Unexptected Flexibility.
    Consulting-Specifying Engineer, Vol. 33, No. 3, 61, March 2003

  • Halton, R.
    view article (6.608105)

    Hose and Nozzles for Effective Operations. Letters to the Editor.
    Fire Engineering, Vol. 156, No. 9, 50,52-57, September 2003

  • Seck, M. D.; Evans, D. D.
    view article (6.608105)

    Major U.S. Cities Using National Standard Fire Hydrants, One Century After the Great Baltimore Fire.
    National Institute of Standards and Technology, Gaithersburg, MD
    NISTIR 7158, August 2004, 14 p.

  • Thompson, S.; Grant, S.
    view article (6.608105)

    First-alarm Considerations for the Initial IC.
    Fire Engineering, Vol. 157, No. 5, 91-94,96, May 2004

  • International Fire Service Training Association
    view article (6.608105)

    Essential of Fire Fighting. 4th Edition.
    International Fire Service Training Association, Stillwater, OK
    4th Edition, 1998, 746 p.

  • Gustin, B.
    view article (6.608105)

    When the First Attack Hoseline Doesn't Go Through the Front Door.
    Fire Engineering, Vol. 157, No. 7, 53-54,56,58, July 2004

  • Jolley, D.
    view article (6.608105)

    'Long-Lay' Hose Loads.
    Fire Fighting in Canada, Vol. 47, No. 3, 53-54,56,62, May 2003

  • Dunn, V.
    view article (6.608105)

    Firefighting Strategies for Heavy Timber Mill Construction. Part 1.
    Firehouse, Vol. 30, No. 1, 24,26-28, January 2005

  • Smith, J. P.
    view article (6.608105)

    Trench Cut: Opening the Roof To Control Fire in a Cockloft.
    Firehouse, Vol. 30, No. 6, 16,18-19, June 2005