FireDOC Search

displaying 171 - 180 results in total 492

  • Kench, R. L.
    view article (1.0)

    Fire Safety in Atomic Power Stations.
    Lloyd's Syndicates' Survey Dept., England
    Fire Prevention, No. 208, 35-36,38-39, April 1988

  • Mowrer, D. S.
    view article (1.0)

    Cost Estimates for Providing Active and Passive Fire Protection Measures in Nuclear Power Plants.
    Professional Loss Control, Inc., Oak Ridge, TN
    SAND81-7169
    Department of Energy, Washington, DC, SAND81-7169
    November 1981
    62 p.

  • Przybyla, L.
    view article (1.0)

    Investigation of Fire Stop Test Parameters. Final Report.
    Sandia National Labs., Albuquerque, NM
    SAND-81-7144
    Nuclear Regulatory Commission, Washington, DC, SAND-81-7144
    September 1981
    150 p.

  • U.S. Nuclear Regulatory Commission
    view article (1.0)

    Reactor Safety Study: An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants. Appendix 9. Safety Design Rationale for Nuclear Power Plants.
    Nuclear Regulatory Commission, Washington, DC
    ['WASH-1400', 'NUREG 75-014']
    WASH-1400; NUREG 75-014
    October 1975
    42 p.

  • Coleman, R. J.
    view article (1.0)

    Evacuation Planning Around a Nuclear Power Plant.
    Director of Fire Protection, San Clemente, CA
    Fire Chief Magazine, Vol. 26, No. 2, 24-27, February 1982

  • Jones, A. V.
    view article (1.0)

    Transportation of Nuclear Waste.
    Gwynedd Fire Service
    Fire, Vol. 74, No. 919, 428,432, January 1982

  • U.S. Nuclear Regulatory Commission
    view article (1.0)

    Reactor Safety Study: An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants. Appendix 10. Design Adequacy.
    Nuclear Regulatory Commission, Washington, DC
    ['WASH-1400', 'NUREG 75-014']
    WASH-1400; NUREG 75-014
    October 1975
    146 p.

  • U.S. Nuclear Regulatory Commission
    view article (1.0)

    Reactor Safety Study: An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants. Appendix 6. Calculation of Reactor Accident Consequences.
    Nuclear Regulatory Commission, Washington, DC
    ['WASH-1400', 'NUREG 75-014']
    WASH-1400; NUREG 75-014
    October 1975
    524 p.

  • U.S. Nuclear Regulatory Commission
    view article (1.0)

    Reactor Safety Study: An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants. Appendix 5. Quantitative Results of Accidents Sequences.
    Nuclear Regulatory Commission, Washington, DC
    ['WASH-1400', 'NUREG 75-014']
    WASH-1400; NUREG 75-014
    October 1975
    123 p.

  • U.S. Nuclear Regulatory Commission
    view article (1.0)

    Reactor Safety Study: An Assessment of Accident Risks in U.S. Commercial Nuclear Power Plants. Appendix 3. Failure Data.
    Nuclear Regulatory Commission, Washington, DC
    ['WASH-1400', 'NUREG 75-014']
    WASH-1400; NUREG 75-014
    October 1975
    97 p.