displaying 181 - 190 results in total 1895
Egyptian Standards Information Service (ESIS)
view article (1.0)Fire Resistance of Elements of Construction.
1980
91 p.Doak, C.
view article (1.0)Sensing Potential Danger.Alison Controls, Fairfield, NJSpecifying Engineer, Vol. 46, No. 1, 49-53, July 1981U.S. Department of Housing and Urban Development
view article (1.0)Mobile Home Construction and Safety Standards, Procedural and Enforcement Regulations and Consumer Manual Requirements.Department of Housing and Urban Development, Washington, DCFederal Register, Vol. 46, No. 152, 40496-40500, Friday, August 7, 1981Schatz, H.
view article (1.0)Loscheisatz bei gelagerten Stoffen. Teil 1. Literaturauswertung und Errichtung der Versuchsanlage. Flame Spread of Materials in Storage. Part 1. Literature Survey and Construction of Apparatus.]Karlsruhe Univ., West GermanyReport 53Report 53
March 1985
63 p.Hansen, W.
view article (1.0)Cost Savings Through Building Commissioning.Associated Air Balance Council. Systems 1987. AABC 23rd Annual Conference and Exposition. October 14-16, 1987., Las Vegas, NV, 111-117 p., 1987Best, R.
view article (1.0)Howard University Hospital Fire, Washington, DC, Successful Construction and Reactions Prevent Fatalities.National Fire Protection Assoc., Quincy, MAFire Journal, Vol. 75, No. 1, 36-40, January 1981Western, F.
view article (1.0)Pre-Planned Fire Safety for the People in Nat West's Tower.Fire, Vol. 73, No. 910, 551-552, April 1981Henry, M. F.
view article (1.0)Underground Leakage: A Potential Fire Problem. Part 2. Corrosion--Its Causes and Prevention.National Fire Protection Assoc., Quincy, MAFire Journal, Vol. 75, No. 3, 61-63,65,142, May 1981National Bureau of Standards
view article (1.0)Report of Fire Tests of Ceiling Constructions.National Bureau of Standards, Gaithersburg, MDResearch Project 17Research Project 17
August 29, 1945
23 p.Quigg, P. S.
view article (1.0)Control Joints in Fire Rated Partitions.USG Corp.Building Official and Code Administrator, Vol. 22, No. 3, 28-29, May/June 1988