FireDOC Search

displaying 181 - 190 results in total 373

  • Wharton, R. K.
    view article (1.0)

    Fire at King's Cross Underground Station, 18th November 1987. Part 5. Ignition Tests and Characterisation of Samples. Incident Report.
    Health and Safety Executive, Derbyshire, UK
    ['Part 5', 'IR/L/FR/88/06', 'RI/FR/1/87']
    Part 5; IR/L/FR/88/06; RI/FR/1/87
    March 9, 1988
    128 p.

  • Moodie, K.
    view article (1.0)

    Fire at King's Cross Underground Station, 18th November 1987. Part 12. Assessment of Fire Dynamics. Updated Version. Incident Report.
    Health and Safety Executive, Derbyshire, UK
    ['Part 12', 'IR/L/FR/88/26', 'RI/FR/1/87']
    Part 12; IR/L/FR/88/26; RI/FR/1/87
    August 18, 1988
    36 p.

  • Gray, T. A.
    view article (1.0)

    NGFA: Fire and Explosion Research Program.
    Continental Grain Co., Chicago, IL
    Industrial Fire Safety, Vol. 1, No. 1, 51,54-56,59-62, November/December 1992

  • Allen, K.; Bett, K.; Danchuk, D. L.; Devins, A.; Hrynchuk, R. J.; Kilert, G. W.; Lischynski, D. K.; Matheson, D. K.; Mithcell, W.; Patel, A. P.; Phillips, D. R.; Schick, J. V.; Tash, J.; Woloschuk, D. W.
    view article (1.0)

    Study of Vehicle Fires of Known Ignition Source.
    International Association of Arson Investigators, Inc., Alberta, Canada
    International Association of Arson Investigators, Inc. Annual Meeting, 36th. Hosted by British Columbia Chapter No. 15. March 24-29, 1985, Vancouver, British Columbia, Canada, 1-87 p., 1985

  • Bloom, J.; Bloom, J; Bloom, C.
    view article (1.0)

    Coffeemaker Fires.
    Fire and Arson Investigator, Vol. 43, No. 3, 35-37, March 1993

  • Ohlemiller, T. J.; Cleary, T. G.; Brown, J. E.; Shields, J. R.
    view article (1.0)

    Assessing the Flammability of Composite Materials.
    National Institute of Standards and Technology, Gaithersburg, MD
    Journal of Fire Sciences, Vol. 11, No. 4, 308-319, July/August 1993
    Naval Surface Weapons Center, Annapolis, MD,
    Sagamore Army Materials Research Conference, 39th. September 16-17, 1992, Plymouth, MA, ['1992', '1993']

  • Cashdollar, K. L.; Hertzberg, M.; Zlochower, I. A.; Lucci, C. E.; Green, G. M.; Thomas, R. A.
    view article (1.0)

    Laboratory Flammability Studies of Mixtures of Hydrogen, Nitrous Oxide, and Air. Final Report.
    Bureau of Mines, Pittsburgh, PA; Westinghouse Hanford Co., Richland, WA
    ['WHC-SC-WM-ES-219', 'DE93-005134']
    Department of Energy, Washington, DC, WHC-SC-WM-ES-219; DE93-005134
    June 26, 1992
    71 p.

  • Silensky, P.
    view article (1.0)

    Protecting Your Facility With a Hot Work Control Program.
    East Longmeadow Fire Dept., MA
    Industrial Fire Safety, Vol. 2, No. 2, 48-52, March/April 1993

  • Loeb, D. L.
    view article (1.0)

    Fire and the Automotive Repair Garage.
    Dunkirk Fire Dept., NY
    Fire Chief, Vol. 37, No. 9, 38-40,42, September 1993

  • International Organization for Standardization
    view article (1.0)

    Fire Tests - Full-Scale Room Test for Surface Products. ISO International Standard.
    International Organization for Standardization, Geneve, Switzerland
    ['ISO 9705', 'First (1st) Edition']
    ISO 9705; First (1st) Edition
    June 15, 1993
    35 p.