FireDOC Search

displaying 221 - 230 results in total 655

  • Thomas, P. H.
    view article (1.0)

    Fires in Enclosures.
    Fire Research Station, Borehamwood, England
    CP 30/74
    CP 30/74
    February 1974
    14 p.

  • Nelson, H. E.; Tu, K. M.
    view article (1.0)

    Engineering Analysis of the Fire Development in the Hillhaven Nursing Home Fire, October 5, 1989.
    National Institute of Standards and Technology, Gaithersburg, MD
    NISTIR 4665
    Department of Health and Human Services, Baltimore, MD, NISTIR 4665
    September 1991
    56 p.

  • Stroup, D. W.; Madrzykowski, D.
    view article (1.0)

    Conditions in Corridors and Adjoining Areas Exposed to Post-Flashover Room Fires.
    National Institute of Standards and Technology, Gaithersburg, MD
    NISTIR 4678
    General Services Administration, Washington, DC, NISTIR 4678
    September 1991
    74 p.

  • Williamson, R. B.
    view article (1.0)

    Fire Safety Requirements and Criteria for Dwellings.
    California Univ., Berkeley
    General Services Administration; Department of Housing and Urban Development; National Bureau of Standards; and National Science Foundation. Conference on Firesafety for Buildings: Research Practice Needs. July 18-20, 1973, Airlie, VA, 176-192 p., 1973

  • Crossland, B.
    view article (1.0)

    King's Cross Underground Fire and the Setting Up of the Investigation.
    Queen's University of Belfast, UK
    Fire Safety Journal, Vol. 18, No. 1, 3-11, 1992

  • Grimwood, P.
    view article (1.0)

    There Are Differences Between 'Backdraft' and a Flashover.
    Fire, Vol. 84, No. 1038, 11-12, December 1991

  • Jolly, S.; Saito, K.
    view article (1.0)

    Scale Modeling of Fires With Emphasis on Room Flashover Phenomenon.
    Kentucky Univ., Lexington
    Fire Safety Journal, Vol. 18, No. 2, 139-182, 1992
    National Institute of Standards and Technology, Gaithersburg, MD,

  • Lie, T. T.; VanSante, F. J.
    view article (1.0)

    Observations During a Fire at Zwolle.
    TT-935
    Bouw, Vol. 15, No. 6, 154-160, 1960
    TT-935
    1961
    21 p.

  • Leonard, J. T.; Fulper, C. R.; Darwin, R. L.; Back, G. G.; Quellette, R. J.; Scheffey, J. L.; Willard, R. L.
    view article (1.0)

    Post-Flashover Fires in Simulated Shipboard Compartments. Phase 2. Cooling of Fire Compartment Boundaries.
    Naval Research Lab., Washington, DC; Naval Sea Systems Command, Washington, DC; Hughes Associates, Inc., Wheaton, MD
    NRL Memorandum 6896
    NRL Memorandum 6896
    September 19, 1991
    44 p.

  • Ulley, L.
    view article (1.0)

    30 Hour Marathon Ensues as Paint Store Flashover Destroys Two Buildings in City of Verdun.
    Fire Fighting in Canada, Vol. 35, No. 9, 6-7, December 1991