FireDOC Search

displaying 251 - 260 results in total 492

  • Barnett, J.
    view article (6.0942507)

    Misusing (Using) Fire Models.
    Worcester Polytechnic Institute, MA
    NISTIR 6986, September 2003, 569 p.
    International Collaborative Project to Evaluate Fire Models for Nuclear Power Plant Applications: Summary of 5th Meeting. APPENDIX D. View Graphs Used for Presentations: Preliminary Results of Behchmark Exercise #2, Part 1, Evaluation of fire Models for Nuclear Facility. May 2-3, 2002, Gaithersburg, MD, D/229-247 p., 2003

  • Roewekamp, M.; Hosser, D.; Dobbernmack, R.
    view article (6.0942507)

    Kerosene Fire Experiments.
    NISTIR 6986, September 2003, 569 p.
    International Collaborative Project to Evaluate Fire Models for Nuclear Power Plant Applications: Summary of 5th Meeting. APPENDIX D. View Graphs Used for Presentations: Future Tasks and Benchmark Exercises. May 2-3, 2002, Gaithersburg, MD, D/307-312 p., 2003

  • Landry, T.; Rogers, G.
    view article (6.0942507)

    Warning Confirmation and Dissemination.
    October 1982, 12 p.

  • Fire Prevention; Fire Enginers Journal
    view article (6.0942507)

    Safe to the Core.
    Fire Prevention, No. 387 / Fire Engineers Journal, Vol. 64, No. 251, 16-18, December 2004

  • Iqbal, N.; Salley, M. H.
    view article (6.0942507)

    Fire Dynamics Tools (FDTs) Quantitative Fire Hazard Analysis Methods for the U.S. Nuclear Regulatory Commission Fire Protection Inspection Program. Final Report.
    U.S. Nuclear Regulatory Commission, Washington, DC
    NUREG-1805, December 2004, 1016 p.
    Fire Dynamics Tools (FDTs) Quantitative Fire Hazard Analysis Methods for the U.S. Nuclear Regulatory Commission Fire Protection Inspection Program. Final Report, U.S. Nuclear Regulatory Commission, Washington, DC, 2004

  • Dreisbach, J.; Hill, K.
    view article (6.0942507)

    Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 3. FDTs.
    Nuclear Regulatory Commission, Washington, DC
    Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 3; Final Report, May 2007, 118 p.

  • Peacock, R. D.; Reneke, P. A.
    view article (6.0942507)

    Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 5. Consolidated Fire Growth and Smoke Transport Model (CFAST).
    National Institute of Standards and Technology, Gaithersburg, MD
    Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 5; Final Report, May 2007, 206 p.

  • Stroup, D.; Kratchman, J.; Gonzalez, F. E.; Salley, M. H.
    view article (6.0942507)

    Browns Ferry Nuclear Plant Fire of 1975 and the History of NRC Fire Regulations.
    Nuclear Regulatory Commission, Washington, DC
    NUREG/BR-0361, Feburary 2009, 10 p.

  • Frantzich, H.; Nilsson, D.
    view article (6.0942507)

    Evacuation in Complex Environments: An Analysis of Evacuation Conditions in a Nuclear Power Plant and a Tunnel Construction Site.
    Lund Univ., Sweden
    Human Behavior in Fire. International Symposium, 4th. Proceedings. July 13-15, 2009, Interscience Communications Ltd., London, England, Cambridge, UK, 207-218 p., 2009

  • Przybyla, L. J.; Christian, W. J.
    view article (6.0184546)

    Development and Verification of Fire Tests for Cable Systems and System Components. Quarterly Report 4. March 1, 1978 to May 31, 1978.
    Nuclear Regulatory Comm., Washington, DC
    NUREG/CR-0346; UL-USNC 75 Q4, September 1978, 52 p.