FireDOC Search

displaying 271 - 280 results in total 768

  • Jin, T. K.
    view article (1.0)

    Design for Fire Safety in Buildings Safe Evacuation of Occupants as the Determinant.
    National University of Singapore
    SIA Journal, No. 177, 55-58, March/April 1993

  • Moss, C. H.
    view article (1.0)

    Smoke Venting Window Systems Designed and Installed to Release Smoke and Heat From a Building During an Outbreak of Fire.
    Building Control, Vol. 26, 70-72, March/April 1989

  • Shields, T. J.
    view article (1.0)

    Fire and Disabled People in Buildings. Building Research Establishment Report.
    University of Ulster, UK
    ['BR 231', 'CI/SIB 98(K24)(U35)']
    BR 231; CI/SIB 98(K24)(U35)
    1993
    79 p.

  • Turner, L.
    view article (1.0)

    BS 5588:Part 8 - The Alpha But Not the Omega.
    British Standards Institution, UK
    University of Ulster and Fire Research Station. CIB W14: Fire Safety Engineering. International Symposium and Workshops Engineering Fire Safety in the Process of Design: Demonstrating Equivalency. Part 1. Symposium: Engineering Fire Safety for People With Mixed Abilities. September 13-16, 1993, Newtownabbey, Northern Ireland, 97-104 p., 1993

  • Kilpatrick, A.; Campbell, L.
    view article (1.0)

    Mixed Ability Evacuation Procedures in High Rise Office Buildings in France.
    Glasgow Caledonian Univ., UK
    University of Ulster and Fire Research Station. CIB W14: Fire Safety Engineering. International Symposium and Workshops Engineering Fire Safety in the Process of Design: Demonstrating Equivalency. Part 1. Symposium: Engineering Fire Safety for People With Mixed Abilities. September 13-16, 1993, Newtownabbey, Northern Ireland, 165-174 p., 1993

  • Frantzich, H.; Jonsson, R.; Rantatalo, T.
    view article (1.0)

    Swedish Regulatory Approach.
    University of Ulster and Fire Research Station. CIB W14: Fire Safety Engineering. International Symposium and Workshops Engineering Fire Safety in the Process of Design: Demonstrating Equivalency. Part 2. Symposium: Engineering Fire Safety for People With Mixed Abilities. September 13-16, 1993, Newtownabbey, Northern Ireland, 71-109 p., 1993

  • Smith, C. I.
    view article (1.0)

    Fire Engineering Design of the Sony CTV Plant, Pencoed, South Wales.
    Fire Safety Engineering Consultants Limited, North Yorkshire
    University of Ulster and Fire Research Station. CIB W14: Fire Safety Engineering. International Symposium and Workshops Engineering Fire Safety in the Process of Design: Demonstrating Equivalency. Part 2. Symposium: Engineering Fire Safety for People With Mixed Abilities. September 13-16, 1993, Newtownabbey, Northern Ireland, 175-195 p., 1993

  • Thompson, P. A.; Marchant, E. W.
    view article (1.0)

    Modelling and Measurement of Escape Movement.
    Edinburgh Univ., Scotland
    University of Ulster and Fire Research Station. CIB W14: Fire Safety Engineering. International Symposium and Workshops Engineering Fire Safety in the Process of Design: Demonstrating Equivalency. Part 3. Symposium: Engineering Fire Safety for People With Mixed Abilities. September 13-16, 1993, Newtownabbey, Northern Ireland, 25-41 p., 1993

  • Beever, P.
    view article (1.0)

    Fire Safety Design.
    Arup, UK
    Architects' Journal, Vol. 197, No. 16, 19,21, April 21, 1993

  • Brend, H. J.; Solomon, D. L.
    view article (1.0)

    Means of Escape in Case of Fire.
    Means of Escape in Case of Fire, Sir Isaac Pitman and Sons, Ltd., London, England, 164 p., 1952