displaying 11 - 13 results in total 13
Dewsbury, J.; Whiteley, R. A.
view article (1.0)Extensions to Standard Hold Time Calculations.UMIST, Manchester, England; Ansul Limited, Manchester, EnglandFire Technology, Vol. 36, No. 4, 266-278, 4th Quarter, November 2000Whiteley, R. A.
view article (1.0)Overpressure Vent Provisions for Inergen Systems.Wormald Ansul UK Ltd.Fire Safety Engineering, Vol. 9, No. 1, 26-27, January 2002Dewsbury, J.; Whiteley, R. A.
view article (1.0)Hold Time Calculations for Non-Standard Enclosures.Department of Civil and Construction Engineering at UMIST, Manchester, England; Wormald Ansul (UK) Limited, Manchester, EnglandFire Technology, Vol. 40, No. 1, 75-89, January 2004