displaying 321 - 330 results in total 1334
Public Safety Systems Incorporated
view article (1.0)Long-Range Planning for the Fire Services: A Grant Request.Public Safety Systems, Inc., Santa Barbara, CAGrant RequestGrant Request
March 15, 1971
46 p.Ehlers, R. W.
view article (1.0)Planning and Design of Tall Buildings With Emphasis on Fire and Life Safety Systems.Bell Telephone, ILUKY TR53-72-CEED2UKY TR53-72-CEED2University of Kentucky. Planning and Design of Tall Buildings. Eigth (8th) Systems Building Seminar. Proceedings. June 5-6, 1972, Lexington, KY, 21-23 p., 1972Beedle, L. S.
view article (1.0)On the Planning and Design of Tall Buildings.Lehigh Univ., Bethlehem, PAUKY TR53-72-CEED2UKY TR53-72-CEED2University of Kentucky. Planning and Design of Tall Buildings. Eigth (8th) Systems Building Seminar. Proceedings. June 5-6, 1972, Lexington, KY, 27-35 p., 1972Dungan, K. W.
view article (1.0)Fire Safety After Restructuring.FACTs, Vol. 4, No. 1, 3-5, Winter 1995Kaetzel, L. J.; Clifton, J. R.
view article (1.0)Expert/Knowledge Based Systems for Materials in the Construction Industry: State-of-the-Art Report.National Institute of Standards and Technology, Gaithersburg, MDRILEM Journal of Materials and Structures, Vol. 28, No. 177, 160-174, 1995Julliet, E.
view article (1.0)Building Evacuation Planning for the Disabled. VHS Video Tape.Martha Jefferson Hospital, Charlottsville, VAVideoVideoFederal Fire Forum. Meeting Today's Challenges on Federal Fire Safety for the Disabled. May 15, 1995, Gaithersburg, MD, 1995Fowler, D. M.
view article (1.0)Management Training in the Fire Service.Fire, Vol. 66, No. 817, 99-100, July 1973Record
view article (1.0)Earthquake!Record, Vol. 72, No. 2, 3-9, Second Quarter 1995Tatum, C. B.; Vanegas, J. A.; Williams, J. M.
view article (1.0)Constructability Improvement During Conceptual Planning.Stanford Univ., CA['Source Document 4', 'Task Force 83-3']Source Document 4; Task Force 83-3
March 1986
195 p.O'Connor, J. T.; Rusch, S. E.; Schulz, M. J.
view article (1.0)Constructability Improvement During Engineering and Procurements.University of Texas, Austin['Source Document 5', 'Task Force 83-3']Source Document 5; Task Force 83-3
May 1986
48 p.