displaying 351 - 360 results in total 2785
Herbert, M. J.
view article (1.0)Practical Guide to the Detection and Control of Mine Fires.British Coal Corp., UKU.S. Department of the Interior, Bureau of Mines. International Conference of Safety in Mines Research Institutes, 23rd Proceedings. September 11-15, 1989, Washington, DC, 200-212 p., 1989Hildebrandt, E.
view article (1.0)Backflow Prevention and Fire Suppression Systems in Illinois.Morton Grove Fire Dept., ILSprinkler Quarterly, No. 68, 56-57, Fall 1989Kennedy, P. E.
view article (1.0)Study to Investigate Portable Ultra High Speed Deluge Systems. Final Report.Day and Zimmermann, Inc., Parsons, KSFinal ReportArmy Production Base Moderization Activity, Picatinny Arsenal, NJ, Final Report
July 1988
88 p.Penafeather, J. C.
view article (1.0)Precode Design for Postcode Operation.Consulting Engineer, Vol. 48, No. 6, 97-99, June 1977Grant, C. C.
view article (1.0)Enclosure Integrity Procedure for Halon 1301 Total Flooding Fire Suppression Systems.National Fire Protection Assoc., Quincy, MA; Halon Research Institute, Chicago, ILRevision 1.0Revision 1.0
January 10, 1989
72 p.Budnick, E. K.; Fleming, R. P.
view article (1.0)Developing an Early Suppression Design Procedure for Quick Response Sprinklers.Hughes Associates, Inc., Wheaton, MD; National Fire Sprinkler Assoc., Patterson, NYFire Journal, Vol. 83, No. 6, 40-46, November/December 1989Fielding, G. H.; Williams, F. W.; Carhart, H. W.
view article (1.0)Fire Suppression--Why Not Water.Naval Research Lab., Washington, DCNRL-MR-3435Naval Sea Systems Command, Washington, DC, NRL-MR-3435
February 1977
16 p.U.S. Department of the Interior
view article (1.0)Health and Safety Standards Relating to Fire Prevention and Control, Air Quality and Ventilation and Radiation. Public Hearing.Department of the Interior, Washington, DCFederal Register, Vol. 42, No. 116, 30772-30780, Thursday, June 16, 1977American Gas Association; Battelle Columbus Laboratories
view article (1.0)American Gas Assoc., Cleveland, OH; Battelle Columbus Labs., OHAmerican Gas Association and Battelle Columbus Laboratories. LNG Safety Program. Interim Report on Phase 2 Work. Project IS-3-1. July 1, 1974, 456 p., 1974Wesson, H. R.
view article (1.0)Fire Control and Vapor Suppression.University Engineers, Inc., Norman, OKAmerican Gas Association and Battelle Columbus Laboratories. LNG Safety Program. Interim Report on Phase 2 Work. Project IS-3-1. July 1, 1974, I/1-21 p., 1974