FireDOC Search

displaying 21 - 30 results in total 35

  • Cole, M.
    view article (1.0)

    Aspirated Smoke Detection Flexibility for Performance Based Building Codes.
    Vision Systems Limited
    Fire Australia Incorporating the Fouth Asia-Pacific Fire Trade Fair, 1996. Australian Fire Protection Association and Institution of Fire Engineers. October 30-November 1, 1996, Melbourne, Australia, 43-53 p., 1996

  • Gratton, G. H. K.
    view article (1.0)

    Standardisation and Rationalisation.
    Fire Engineers Journal, Vol. 57, No. 191, 25-29, November 1997

  • Jerome, I.
    view article (1.0)

    Greater Flexibility From the Building Regulations.
    Fire Prevention, No. 330, 10-12, March 2000

  • Shirley, S.
    view article (1.0)

    Helping People to Help Themselves.
    Fire International, No. 176, 24-25, May 2000

  • Hanser, A.
    view article (1.0)

    Assembly + Disassembly of Interior Wall.
    Technical University Munich
    NIST SP 989, September 2002,
    International Symposium on Automation and Robotics in Construction, 19th (ISARC). Proceedings. National Institute of Standards and Technology, Gaithersburg, Maryland. September 23-25, 2002, 299-302 p., 2002

  • Consulting-Specifying Engineer
    view article (1.0)

    Unusual Sprinkler Hose Lends Unexptected Flexibility.
    Consulting-Specifying Engineer, Vol. 33, No. 3, 61, March 2003

  • Zimmerman, R.
    view article (1.0)

    Public Infrastructure Service Flexibility for Response and Recovery in the Attacks at the World Trade Center, September 11, 2001.
    Wagner Graduate School of Public Service, NY
    Program on Environment and Behavior; Special Publication #39, 2003,

  • Bergeron, D.
    view article (1.0)

    Role of Acceptable Solutions in Evaluating Innovative Designs.
    National Research Council of Canada, Ottawa, Ontario
    Strategies for Performance in the Aftermath of the World Trade Center. CIB-CTBUH Conference on Tall Buildings. Proceedings. Task Group on Tall Buildings: CIB TG50. CIB Publication No. 290. October 20-23, 2003, Kuala Lumpur, Malaysia, Shafii, F.; Bukowski, R.; Klemencic, R., Editors, 373-381 p., 2003

  • Reitzel, E.
    view article (1.0)

    Structural Design of Tall Buildings With a Minimal Risk of Collapse.
    Technical University of Denmark, Lyngby
    Strategies for Performance in the Aftermath of the World Trade Center. CIB-CTBUH Conference on Tall Buildings. Proceedings. Task Group on Tall Buildings: CIB TG50. CIB Publication No. 290. October 20-23, 2003, Kuala Lumpur, Malaysia, Shafii, F.; Bukowski, R.; Klemencic, R., Editors, 599-606 p., 2003

  • Austin, A.
    view article (1.0)

    Fixed-Point Gas Detection Systems.
    Fire Engineering, Vol. 156, No. 11, November 2003