displaying 471 - 480 results in total 492
Hamins, A.; Maranghides, A.; Johnsson, E. L.; Donnelly, M. K.; Yang, J. C.; Mulholland, G. W.; Anleitner, R. L.
view article (1.0)Report of Experimental Results for the International Fire Model Benchmarking and Validation Exercise #3.National Institute of Standards and Technology, Gaithersburg, MD['NIST SP 1013-1', 'NIST Special Publication 1013-1', 'NUREG/CR-6905']U.S. Nuclear Regulatory Commission, Washington, DC, NIST SP 1013-1; NIST Special Publication 1013-1; NUREG/CR-6905
June 2005
189 p.Shen, T.S.
view article (1.0)Will the Second Cable Tray Be Ignited In a Nuclear Power Plant?Central Police Univ., Taoyuan, Taiwan 333Journal of Fire Sciences, Vol. 24, No. 4, 265-274, July 2006Vidmar, P.; Petelin, S.
view article (1.0)Analysis of the Effect of an External Fire on the Safety Operation of a Power Plant. Short Communication.Ljubljana Univ., Portoroz, SloveniaFire Safety Journal, Vol. 41, No. 9, 486-490, September 2006Salley, M. H.; Dreisbach, J.; Hill, K.; Kassawara, R.; Najafi, B.; Joglar, F.; Hamins, A.; McGrattan, K. B.; Peacock, R. D.; Gautier, B.
view article (1.0)Verification and Validation: How to Determine the Accuracy of Fire Models.Nuclear Regulatory Commission; Electric Power Research Institute; National Institute of Standards and Technology, Gaithersburg, MD; Electricite de FranceFire Protection Engineering, No. 34, 34,36,38,40,42,44, Spring 2007Najafi, B.; Joglar, F.; Dreisbach, J.
view article (1.0)Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 1. Main Report.Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA; Science Applications International Corp., Los Altos, CA['NUREG-1824', 'EPRI 1011999', 'Volume 1', 'Final Report']Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 1; Final Report
May 2007
62 p.Hamins, A.; McGrattan, K. B.
view article (1.0)Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 2. Experimental Uncertainty.National Institute of Standards and Technology, Gaithersburg, MD['NUREG-1824', 'EPRI 1011999', 'Volume 2', 'Final Report']Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 2; Final Report
May 2007
105 p.Dreisbach, J.; Hill, K.
view article (1.0)Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 3. FDTs.Nuclear Regulatory Commission, Washington, DC['NUREG-1824', 'EPRI 1011999', 'Volume 3', 'Final Report']Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 3; Final Report
May 2007
118 p.Joglar, F.
view article (1.0)Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 4. Fire-Induced Vulnerability Evaluation (FIVE-Rev1).Electric Power Research Institute, Palo Alto, CA['NUREG-1824', 'EPRI 1011999', 'Volume 4', 'Final Report']Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 4; Final Report
May 2007
100 p.Peacock, R. D.; Reneke, P. A.
view article (1.0)Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 5. Consolidated Fire Growth and Smoke Transport Model (CFAST).National Institute of Standards and Technology, Gaithersburg, MD['NUREG-1824', 'EPRI 1011999', 'Volume 5', 'Final Report']Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 5; Final Report
May 2007
206 p.Joglar, F.; Gautier, B.; Gay, L.; Texeraud, J.
view article (1.0)Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 6. MAGIC.Electric Power Research Institute, Palo Alto, CA['NUREG-1824', 'EPRI 1011999', 'Volume 6', 'Final Report']Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 6; Final Report
May 2007
206 p.