Chapman, R. E.
view article (8.121812)
Benefits and Costs of Research: A Case Study of Cybernetic Building Systems.
National Institute of Standards and Technology, Gaithersburg, MD
NISTIR 6303,
March 1999,
167 p.
Chapman, R. E.; Thomas, D. S.
view article (8.121812)
Guide to Printed and Electronic Resources for Developing a Cost-Effective Risk Mitigation Plan for New and Existing Constructed Facilities.
National Institute of Standards and Technology, Gaithersburg, MD; National Institute of Standards and Technology, Gaithersburg, MD
NISTIR 7390,
February 2007,
156 p.
Chapman, R. E.
view article (8.114269)
Assessing the Costs of Fire Protection in Health Care Facilities.
National Bureau of Standards, Gaithersburg, MD
Fire Safety Journal,
Vol. 9,
No. 2,
221-231,
1985
National Bureau of Standards, Gaithersburg, MD,
Chapman, R. E.; Hall, W. G.
view article (8.114269)
Code Compliance at Lower Costs: A Mathematical Programming Approach.
National Bureau of Standards, Gaithersburg, MD
Fire Technology,
Vol. 18,
No. 1,
77-89,
February 1982
National Fire Protection Assoc. Analytic Problems in Firesafety: Rational Firesafety Design. NFPA Research. Joint ORSA/TIMS Meeting. May 1980.,
National Fire Protection Assoc., Quincy, MA,
Washington, DC,
1-17 p.,
1982
Chapman, R. E.; Kowalski, J. G.
view article (8.114269)
Lead Paint Abatement Costs: Some Technical and Theoretical Considerations. Technical Note.
National Bureau of Standards, Washington, DC
Department of Housing and Urban Development, Washington, DC,
NBS TN 979,
February 1979,
Thompson, B. E.; Chapman, R. E.
view article (8.114269)
Productivity in Residential Construction: An Annotated Bibliography. Final Report.
National Bureau of Standards, Washington, DC
NBSIR 80-2150,
February 1981,
Culver, C. C.; Chapman, R. E.; Cooke, P. W.; Ellingwood, B. R.; Fattal, S. G.
view article (8.114269)
Plan for the Assessment and Implementation of Seismic Design Provisions for Buildings. Final Report.
National Bureau of Standards, Washington, DC
National Science Foundation, Washington, DC,
NBSIR 78-1549,
October 1978,
Pielert, J. H.; Chapman, R. E.; Hall, W. G.
view article (8.114269)
Application of an Equivalency Methodology to Building Rehabilitation: A Pilot Study.
National Bureau of Standards, Washington, DC
NBSIR 81-2416,
January 1982,
Chapman, R. E.; Weber, S. F.
view article (8.114269)
Benefits and Costs of Research: A Case Study of the Fire Safety Evaluation System.
National Institute of Standards and Technology, Gaithersburg, MD
NISTIR 5863,
July 1996,
85 p.
Chapman, R. E.; Marshall, H. E.; Forman, E. H.
view article (8.114269)
AHP (Analytical Hierarchy Process)/Expert Choice for ASTM Building Evaluation.
National Institute of Standards and Technology, Gaithersburg, MD; Expert Choice, Inc., Pittsburgh, PA