FireDOC Search

displaying 511 - 520 results in total 578

  • Santos-Reyes, J.; Beard, A. N.
    view article (5.845662)

    Systemic Approach to Fire Safety Management.
    Heriot-Watt University, Edinburgh, Scotland
    Fire Safety Journal, Vol. 36, No. 4, 359-390, June 2001

  • Pollock, W.
    view article (5.845662)

    Wireless: the Future of BAS?
    Optimation Technology, Rush, NY
    Consulting-Specifying Engineer, Vol. 30, No. 5, 24-26,28, November 2001

  • Parris, J.
    view article (5.845662)

    Fire on the Airwaves.
    BT Quandrant, UK
    Fire Prevention, No. 350, 27-28, November 2001

  • Doherty, J. M.
    view article (5.845662)

    Team to Talk.
    Redwood Fire Dept., CA
    Fire Chief, Vol. 45, No. 11, 100,102-103, November 2001

  • O'Connor, D. J.; Cui, E.; Spinn, J. P.; Su, C. H.; Stashak, C. L.
    view article (5.845662)

    Schirmer Engineering Corp., Deerfield, IL
    Society of Fire Protection Engineers, Bethesda, MD; Society of Fire Safety, Melbourne, Australia; International Council for Research and Innovation in Building Construction, Sweden,
    Fire Safety Design of a High Rise Hotel. American Case Study. Volume 3. Case Studies. Performance-Based Codes and Fire Safety Design Methods, 4th International Conference. Proceedings. March 20-22, 2002, Melbourne, Australia, Almand, K.; Coate, C.; England, P.; Gordon, J., Editors, 93 p., 2002

  • Pollock, W.
    view article (5.845662)

    Wireless: Building Automation's Future?
    Optimation Technology Inc., Rush, NY
    Building Design and Construction, Vol. 43, No. 4, 14, April 2002

  • Bushnell, K.
    view article (5.845662)

    Devon Takes Mobile Printing Solution on Board.
    Fire, Vol. 95, No. 1165, 30, July 2002

  • Coleman, R. J.
    view article (5.845662)

    Smart Buildings.
    Fire and Emergency Television Network, CA
    Sprinkler Age, Vol. 21, No. 12, 26-27, December 2002

  • Ross, J. M.
    view article (5.845662)

    Interior Radio Repeater: Can It Be An Improvement in High Rise Communications? Strategic Analysis of Fire Deparment Operations.
    Cincinnati Fire Dept., OH
    December 1989, 25 p.

  • Barber, D.; VanMerkestein, R.
    view article (5.845662)

    Will Occupants of Tall Buildings Obey Instructions From Wardens in Staged Evacuations? The Design Dilemma Post September 11.
    Arup Fire; Mckenzie Group
    Strategies for Performance in the Aftermath of the World Trade Center. CIB-CTBUH Conference on Tall Buildings. Proceedings. Task Group on Tall Buildings: CIB TG50. CIB Publication No. 290. October 20-23, 2003, Kuala Lumpur, Malaysia, Shafii, F.; Bukowski, R.; Klemencic, R., Editors, 61-70 p., 2003