displaying 41 - 50 results in total 285
Isman, W. E.
view article (1.0)39-Hour Pump Operators Course Combines Theory, Practical Work.Montgomery County Fire/Rescue Training Officer, MDFire Engineering, Vol. 127, No. 10, 18-22, October 1974Union Carbide Corporation
view article (1.0)Analysis of the Effectiveness of UCAR Rapid Water Additive in Fire Fighting Streams. Technical Service Report.Union Carbide Corp.TSR-73-118, 1973, 81 p.Ingberg, S. H.
view article (1.0)Hose-Stream Test as a Part of Fire-Testing Procedure.Structural and Fire Protection Engineer, Bethesda, MDASTM STP 344,Fire Test Methods Symposium. Fourth (4th) Pacific Area Meeting Papers. Proceedings. American Society for Testing and Materials. ASTM STP 344. 1962, ASTM, Philadelphia, PA, 57-68 p., 1962Keith, G.; Garner, D.
view article (1.0)Sprinkler System Water Supply Analysis.Factory Mutual Engineering and Research, Boston, MAFire Engineering, Vol. 144, No. 12, 67-68,70-71, December 1991Peters, W. C.
view article (1.0)Practical Approach to Large-Diameter Hose.Jersey City Fire Dept., NJFire Engineering, Vol. 145, No. 1, 42,44,46,49, January 1992Fire Engineering
view article (1.0)Fire Fighter Qualifications Written for NFPA Approval.Fire Engineering, Vol. 127, No. 8, 156,158,160, August 1974Mittendorf, J.; Dreher, R.
view article (1.0)Electrical Hazards. Part 2.Los Angeles City Fire Dept., CAAmerican Fire Journal, Vol. 44, No. 4, 30-37, April 1992U.S. Department of Agriculture
view article (1.0)Specification for Wrenches, Spanner, Fire Hose.Department of Agriculture, Washington, DCSpecification 5100-101, June 21, 1963, 6 p.U.S. Department of Agriculture
view article (1.0)Specification for Couplings, Fire and Suction Hose.Department of Agriculture, Washington, DCSpecification 5100-102a; Amendment-1, February 15, 1965, 19 p.U.S. Department of Agriculture
view article (1.0)Specification for Tee Coupling.Department of Agriculture, Washington, DCSpecification 5100-103a, January 31, 1966, 5 p.