FireDOC Search

displaying 41 - 50 results in total 59

  • Gebacz, L. E.
    view article (7.6910286)

    Design, Manufacture, and Test of Collant Pump-Motor Assembly for Brayton Power Conversion System. Contractor Report.
    Pesco Products, Bedford, OH
    National Aeronautics and Space Admin., Washington, DC, NASA CR-2176, March 1973, 200 p.

  • Cresswell, F. L.
    view article (7.6910286)

    Background to Sprinkler Design and the Use of Pumps.
    Guardian Royal Exchange Assurance
    Fire Surveyor, Vol. 9, No. 6, 39-45, December 1980

  • Wilson, A.
    view article (7.6910286)

    Pump Acceptance Testing.
    Phoenix Assurance Co. Ltd., England
    Fire Surveyor, Vol. 7, No. 4, 20-31, August 1978

  • Morgan, H. P.; Bullen, M. L.
    view article (7.6910286)

    Method of Extracting Smoke From Buildings Using a Water-Air Jet Pump.
    Fire Research Station, Borehamwood, England
    Fire Technology, Vol. 12, No. 4, 311-320, November 1976

  • Cole, R. B.; Magee, R. S.; Hollenberg, J. W.
    view article (7.6910286)

    Hydrogen Storage and Transfer. Semi-Annual Technical Report. February 1, 1975-July 31, 1975.
    Stevens Institute of Technology, Hoboken, NJ
    Department of Defense, Washington, DC, ME-TR-75008, August 25, 1975, 89 p.

  • Nemeth, G.
    view article (7.6910286)

    Fire Precautionary Measures Concerning the Establishing and Operating of the Atomic Power Station.
    National Headquarters of Fire Brigades, Budapest, Hungary
    Gepipari Tudomanyos Egyesulet. International Symposium on Fire Protection of Buildings, 3rd. May 10-12, 1990, Eger, Hungary, Banky, T.; Kovacs, B. D., Editors, 65-72 p., 1990

  • U.S. Army Test and Evaluation Command
    view article (7.6910286)

    Pumping Assembly, Flammable Liquid, Bulk Transfer. U.S. Army Test and Evaluation Command Material Test Procedure 9-3-183, Commodity Engineering Test Procedure.
    Army Test and Evaluation Command, Aberdeen Proving Ground, MD
    MTP 9-3-183, August 4, 1970, 26 p.

  • Isaksson, S.; Holmberg, L.; Jacobsson, P.
    view article (7.6910286)

    Sprinklersystems vattentillopp-tillforlitlighet. [Reliability of Water Supply Sources for Sprinkler Systems.]
    Swedish National Testing and Research Institute, Boras, Sweden
    SP Report 1998:12, 1998, 46 p.

  • Isaksson, S.; Holmberg, L.; Jacobsson, P.
    view article (7.6910286)

    Sprinklersystems vattentillopp: tillforlitlighet. [Sprinkler System Water Supply Reliability.]
    Swedish National Testing and Research Institute, Boras, Sweden
    SP Report 1998:12, 1998, 46 p.

  • Smith, D. M.; Reser, T. W.
    view article (7.6910286)

    Examination of an Alternative Delivery Method for a Sustainable Clean Agent in a Total Flooding System.
    CAPS Fire, Inc. (Clean Agent Pumping Systems), Vancouver, WA
    NIST SP 984-2; NIST Special Publication 984-2,
    Halon Options Technical Working Conference, 14th. Proceedings. HOTWC 2004. Sponsored by: 3M Specialty Materials, Boeing, Chemical Development Studies, Inc., DuPont Fire Extinguishants, Halon Alternative Research Corp., Hughes Associates, Inc., Kidde-Fenwal, Inc., Sandia National Laboratories, SEVO Systems, Next Generation Fire Suppression Technology Program. May 4-6, 2004, Albuquerque, NM, 1-13 p., 2004