displaying 601 - 610 results in total 1895
Sovkov, E. P.; Vasilevo, N.
view article (1.0)Highly Expanded Foam--An Effective Means of Putting Out Fires.Vysokokratnaya pena-effektivnoe sredstvo tusheniya pozharov, 1-48, 1965Loikkanen, P.; Mangs, J.
view article (1.0)[Investigation on the Operation and Safe Use of a Flashover Simulator for the Training of Fire Departments.]Technical Research Centre of Finland, EspooResearch Report PAL1166/91Research Report PAL1166/91
June 18, 1991
70 p.Lie, T. T.
view article (1.0)Characteristic Temperature Curves for Various Fire Severities.National Research Council of Canada, Ottawa, OntarioFire Technology, Vol. 10, No. 4, 315-326, November 1974National Bureau of Standards Technical News Bulletin
view article (1.0)Fire Resistance of Heavy Timber Construction.Technical News Bulletin (National Bureau of Standards), No. 349, 35-35, May 1946Carino, N. J.; Clifton, J. R.
view article (1.0)High-Performance Concrete: Research Needs to Enhance Its Use.National Institute of Standards and Technology, Gaithersburg, MDACI Concrete International, 70-76, September 1991Moodie, K.; Jagger, S. F.
view article (1.0)King's Cross Fire: Results and Analysis From the Scale Model Tests.Health and Safety Executive, Derbyshire, UKFire Safety Journal, Vol. 18, No. 1, 83-103, 1992Ingberg, S. H.
view article (1.0)Hose-Stream Test as a Part of Fire-Testing Procedure.Structural and Fire Protection Engineer, Bethesda, MDASTM STP 344ASTM STP 344Fire Test Methods Symposium. Fourth (4th) Pacific Area Meeting Papers. Proceedings. American Society for Testing and Materials. ASTM STP 344. 1962, ASTM, Philadelphia, PA, 57-68 p., 1962Construction Industry Institute
view article (1.0)Employee-Based Project Incentives.Construction Industry Institute, Austin, TXResearch Summary 140-1Research Summary 140-1
June 1999
18 p.Brown, C. R.
view article (1.0)Fire Tests of Treated and Untreated Wood Partitions.National Bureau of Standards, Washington, DCRP 1076Journal of Research of the National Bureau of Standards, Vol. 20, 217-239, February 1938RP 1076Gibbs and Cox, Inc.
view article (1.0)Literature Search and Accumulation of Basic Data for Preparation of Damage Control Criteria. Phase 1.Gibbs and Cox, Inc., New York['Phase 1', 'G&C Project 16381']Naval Ship Engineering Center, Washington, DC, Phase 1; G&C Project 16381
January 1969
370 p.