FireDOC Search

displaying 671 - 680 results in total 1041

  • Fire Research News
    view article (1.0)

    Specifying Attendance Times.
    Fire Research News, No. 23, 17-19, Spring 2001

  • Ord, J.
    view article (1.0)

    Top Gear: Strathclyde's New Vehicle Mounted Data Management System.
    Fire, Vol. 93, No. 1149, 33, March 2001

  • Almond, G.
    view article (1.0)

    Commonwealth Games 2002: Public Safety Planning.
    Fire Engineers Journal, Vol. 61, No. 211, 20-23, March 2001

  • Williams, D. G.; Wright, M. D.
    view article (1.0)

    Independent Review and Validation of the Proposed Risk Methods and Toolkits for the Fire Service Emergency Cover Review.
    Mott MacDonald Lt., UK
    ['FRDG Publication Number 4/2001', 'Research Report Number 4/2001']
    FRDG Publication Number 4/2001; Research Report Number 4/2001
    2001
    114 p.

  • Meacham, B. J.
    view article (1.0)

    Understanding Risk.
    Arup Risk Management, Westborough, MA
    Building Tomorrow's Future (BTF) Conference 2001. Proceedings. Australian Building Codes Board (ABCB). Sponsored by: Standards Australia, BRANZ, Australian Window Association, Australian Greenhouse Office, Building Center of Japan, Plantation Timber Association, Master Builders, Australian Building Energy Council, Quantas, IRCC. April 9-11, 2000, Australia, 1-15 p., 2001

  • Zhao, L. D.
    view article (1.0)

    Using Risk-Based Time Method to Determine the Maximum Travel Distance for Building Design.
    Ove Arup and Partners Hong Kong Limited, Kowloon Tong
    International Journal on Engineering Performance-Based Fire Codes, Vol. 2, No. 3, 81-89, 2000

  • O'Sullivan, J.
    view article (1.0)

    Rising to the Challenge.
    Fire Prevention, No. 343, ii-iii, April 2001

  • Mizon, S.
    view article (1.0)

    Insurance Covered.
    Fire Prevention, No. 343, vii-ix, April 2001

  • Cane, P.
    view article (1.0)

    Private Practice.
    Fire Prevention, No. 343, 36-37, April 2001

  • Thomas, M. D.
    view article (1.0)

    Implementation of the Proposed Fire Service Emergency Cover Planning Process. Interim Report.
    ['FRDG Publication Number 5/2001', 'Research Report Number 5/2001']
    FRDG Publication Number 5/2001; Research Report Number 5/2001
    2001
    25 p.