displaying 61 - 70 results in total 854
Kirkwood, S.
view article (1.0)Uncharted Technology.Tualatin Valley Fire and Rescue, Aloha, ORFire Chief, Vol. 42, No. 12, 34,36-39, December 1998Chapman, R. E.
view article (1.0)Assessing the Costs of Fire Protection in Health Care Facilities.National Bureau of Standards, Gaithersburg, MDFire Safety Journal, Vol. 9, No. 2, 221-231, 1985National Bureau of Standards, Gaithersburg, MD,Kisko, T. M.; Francis, R. L.
view article (1.0)EVACNET+: A Computer Program to Determine Optimal Building Evacuation Plans.Florida Univ., Gainesville, FLFire Safety Journal, Vol. 9, No. 2, 211-220, 1985National Bureau of Standards, Gaithersburg, MD,Pennel, G.
view article (1.0)Computer Based Sprinkler Plans.Sprinkler Design Service Inc., Wheeling, ILFire Safety Journal, Vol. 9, No. 2, 165-170, 1985Society of Fire Protection Engineers. Computer Applications in Fire Protection: Analysis, Modeling, and Design. March 19-21, 1984, Leesburg, VA, 16 p., ['1984', '1985']Alvord, D. M.
view article (1.0)Status Report on the Escape and Rescue Model and the Fire Emergency Evacuation Simulation for Multifamily Buildings.American Institute of Architects Foundation, Washington, DCNBS GCR 85-496National Bureau of Standards, Gaithersburg, MD, NBS GCR 85-496
June 1985
231 p.Walton, W. D.
view article (1.0)ASET-B: A Room Fire Program for Personal Computers.National Bureau of Standards, Gaithersburg, MD['NBSIR 85-3144-1', 'CIB W14/85/19 (USA)']Fire Technology, Vol. 21, No. 4, 293-309, November 1985National Park Service, Washington, DC; Department of Health and Human Services, Washington, DC, NBSIR 85-3144-1; CIB W14/85/19 (USA)
Revised December 1985
41 p.Evans, D. D.; Stroup, D. W.
view article (1.0)Methods to Calculate the Response Time of Heat and Smoke Detectors Installed Below Large Unobstructed Ceilings.National Bureau of Standards, Gaithersburg, MDNBSIR 85-3167Fire Technology, Vol. 22, No. 1, 54-65, February 1986Nuclear Regulatory Commission, Washington, DC, NBSIR 85-3167
July 1985
49 p.Lawson, J. R.; Quintiere, J. G.
view article (1.0)Slide-Rule Estimates of Fire Growth.National Bureau of Standards, Gaithersburg, MD['NBSIR 85-3196', 'CIB W14/85/17 (USA)']Fire Technology, Vol. 21, No. 4, 267-292, November 1985David Taylor Naval Ship R and D Center, Washington, DC, NBSIR 85-3196; CIB W14/85/17 (USA)
June 1985
56 p.Riepenhoff, M. S.
view article (1.0)Investigation of Two-Dimensional Transient Conduction as Related to Fire Spread on a Vertical Wall.Notre Dame Univ., IN
June 1984
101 p.Emmons, H. W.
view article (1.0)Calculation of a Fire in a Large Building.Harvard Univ., Cambridge, MA['Home Fire Proj. Tech. Rpt. 62', 'ASME 81-HT-2']National Bureau of Standards, Gaithersburg, MD, Home Fire Proj. Tech. Rpt. 62; ASME 81-HT-2
April 14, 1981
9 p.ASME/AIChE National Heat Transfer Conference, 20th. August 2-5, 1981, Milwaukee, WI, 1981