displaying 71 - 80 results in total 195
Reilly, R. J.
view article (1.0)Automatic Sprinkler Installation Economics.Jaros, Baum and Bolles, New YorkSociety of Fire Protection Engineers. Impact of the Report of the President's Commission on Fire Prevention and Control. 3rd Annual Fire Safety Seminar. February 27, 1974, New York, NY, 1-14 p., 1974Kravontka, S. J.
view article (1.0)False Fire Alarms in Urban Public Schools.Board of Education, New YorkFire Technology, Vol. 10, No. 3, 221-227, August 1974Davies, J. L. M.; Foulsham, N.
view article (1.0)Fire Incidents in Power Stations and Their Effects on Cable Installations.Central Electricity Generating BoardElectrical Research Association. Fire Protection of Cables Symposium. May 1972, Electrical Res. Assoc., Surrey, England, Surrey, England, 8-9 p., 1972Foulsham, N.
view article (1.0)Design of Power Station Cable Installations to Limit the Effects of Fire.Central Electricity Generating BoardElectrical Research Association. Fire Protection of Cables Symposium. May 1972, Electrical Res. Assoc., Surrey, England, Surrey, England, 25-27 p., 1972Hadaway, H. W.; Smith, S. F.; Wilson, T. E.
view article (1.0)Relation of Protection to Installation.London Transport Executive, EnglandElectrical Research Association. Fire Protection of Cables Symposium. May 1972, Electrical Res. Assoc., Surrey, England, Surrey, England, 32-34 p., 1972McAllister, D.
view article (1.0)Comments on Relation of Protection to Installation.BICC Ltd.Electrical Research Association. Fire Protection of Cables Symposium. May 1972, Electrical Res. Assoc., Surrey, England, Surrey, England, 36-37 p., 1972Bayliss, D. A.; Foulsham, N.; Price, C. F.
view article (1.0)Evaluation of Fire Preventative Methods for Cabling Installations.CentralElectricity Generating BoardElectrical Research Association. Fire Protection of Cables Symposium. May 1972, Electrical Res. Assoc., Surrey, England, Surrey, England, 94-98 p., 1972Waterman, T. E.; Labes, W. G.; Salzberg, F.; Tamney, J. E.; Vodvarka, F. J.
view article (1.0)Prediction of Fire Damage to Installations and Built-Up Areas From Nuclear Weapons. Phase 3. Experimental Studies: Appendices A-G. Final Report.IIT Research Inst., Chicago, IL['Phase 3', 'Final Report']National Military Command System Support Center, Washington, DC, Phase 3; Final Report
November 1964
360 p.Penner, A. F.
view article (1.0)Pre-Bonding Surface Cleaning Solvent Evaluation Tests.Westinghouse Electric Corp., Sunnyvale, CATN 72-34TN 72-34
March 20, 1972
14 p.Meacham, B. J.
view article (1.0)Factors Affecting the Early Detection of Fire in Electronic Equipment and Cable Installations.FP&C Consultants, Inc., Newton, MAInternational Symposium on Fire Protection for the Telecommunications Industry. May 14-15, 1992, New Orleans, LA, 1-38 p., 1992