FireDOC Search

displaying 901 - 910 results in total 1237

  • Wong, Y.; Butterworth, N.
    view article (1.0)

    Integrated Structural Fire Design for High Rise Buildings.
    Buro Happold FEDRA, Leeds, UK
    Strategies for Performance in the Aftermath of the World Trade Center. CIB-CTBUH Conference on Tall Buildings. Proceedings. Task Group on Tall Buildings: CIB TG50. CIB Publication No. 290. October 20-23, 2003, Kuala Lumpur, Malaysia, Shafii, F.; Bukowski, R.; Klemencic, R., Editors, 649-656 p., 2003

  • Wang, Y. C.
    view article (1.0)

    Fire Resistant Design Criteria of Tall Building Structures.
    Manchester Centre for Civil and Construction Engineering/UMIST, Manchester, UK
    Strategies for Performance in the Aftermath of the World Trade Center. CIB-CTBUH Conference on Tall Buildings. Proceedings. Task Group on Tall Buildings: CIB TG50. CIB Publication No. 290. October 20-23, 2003, Kuala Lumpur, Malaysia, Shafii, F.; Bukowski, R.; Klemencic, R., Editors, 657-664 p., 2003

  • Proe, D. J.; Johnson, P. F.; Hough, R.
    view article (1.0)

    Design of Structures for Fire in the Australian Regulatory Environment and the Impact of the WTC Collapse.
    Arup Fire, Melborune, Australia; Arup Structures, Sydney, Australia
    Strategies for Performance in the Aftermath of the World Trade Center. CIB-CTBUH Conference on Tall Buildings. Proceedings. Task Group on Tall Buildings: CIB TG50. CIB Publication No. 290. October 20-23, 2003, Kuala Lumpur, Malaysia, Shafii, F.; Bukowski, R.; Klemencic, R., Editors, 665-672 p., 2003

  • Kealy, M.
    view article (1.0)

    Fire Engineering of Tall Buildings Lessons Learned From 9/11.
    WSP Fire, London, England
    Strategies for Performance in the Aftermath of the World Trade Center. CIB-CTBUH Conference on Tall Buildings. Proceedings. Task Group on Tall Buildings: CIB TG50. CIB Publication No. 290. October 20-23, 2003, Kuala Lumpur, Malaysia, Shafii, F.; Bukowski, R.; Klemencic, R., Editors, 673-679 p., 2003

  • Chen, C. K.; Yao, B.; Fan, W. C.
    view article (1.0)

    Preliminary Studies of Fire-Whirl in High-Rise Buildings Using Numerical Simulation.
    University of Science and Technology of China, Anhui
    Strategies for Performance in the Aftermath of the World Trade Center. CIB-CTBUH Conference on Tall Buildings. Proceedings. Task Group on Tall Buildings: CIB TG50. CIB Publication No. 290. October 20-23, 2003, Kuala Lumpur, Malaysia, Shafii, F.; Bukowski, R.; Klemencic, R., Editors, 681-687 p., 2003

  • Barista, D.
    view article (1.0)

    High-Tech Hazard.
    Building Design and Construction, Vol. 44, No. 8, 54-56,58-59, August 2003

  • Siddens, S.
    view article (1.0)

    Role of the Engineer.
    Consulting-Specifying Engineer, Vol. 34, No. 1, 45-48, July 2003

  • Grosshandler, W. L.
    view article (1.0)

    Research and Development Program for the Safety of Threatened Buildings.
    National Institute of Standards and Technology, Gaithersburg, MD
    Fire Science and Fire Protection Engineering International Symposium. Proceedings. China Fire Proection Association. October 2003, Beijing, China, 100-103 p., 2003

  • Feng, M.; Wang, Y. C.; Davies, J. M.
    view article (1.0)

    Axial Strength of Cold-Formed Thin-Walled Steel Channels Under Non-Uniform Temperatures in Fire.
    University of Manchester, Oxford Road, Manchester, UK
    Fire Safety Journal, Vol. 38, No. 8, 679-707, December 2003

  • Mawhinney, J. R.
    view article (1.0)

    Real World Testing of High Pressure Water Mist Pumps.
    Hughes Associates, Inc., Baltimore, MD
    Fire Suppression Technologies Workshop. February 24-27, 2003, Mobile, AL, 1-2 p., 2003