Chapman, R. E. | Rennison, R.
Title
Approach for Measuring Reductions in Operations, Maintenance, and Energy Costs: Baseline Measures of Construction Industry Practices for the National Construction Goals.
Coporate
National Institute of Standards and Technology, Gaithersburg, MD
Sponsor
National Science and Technology Council, Washington, DC
Report
NISTIR 6185, July 1998, 377 p.
Distribution
AVAILABLE FROM National Technical Information Service (NTIS), Technology Administration, U.S. Department of Commerce, Springfield, VA 22161. Telephone: 1-800-553-6847 or 703-605-6000; Fax: 703-605-6900. Website: http://www.ntis.gov
Keywords
construction | building economics | building materials | building maintenance | costs | economic analysis | energy costs | energy consumption | energy conservation | maintenance costs | metrics | operations costs
Abstract
The Construction and Building Subcommittee of the National Science and Technology Council is developing baseline measures of current construction industry practices and measures of progress with respect to each of the seven National Construction Goals. The seven National Construction Goals are concerned with: (1) reductions in the delivery time of constructed facilities; (2) reductions in operations, maintenance, and energy costs; (3) increases in occupant productivity and comfort; (4) reductions in occupant-related illnesses and injuries; (5) reductions in waste and pollution; (6) increases in the durability and flexibility of constructed facilities; and (7) reductions in construction worker illnesses and injuries. Baseline measures and measures of progress are being produced for each of the four key construction industry sectors. The four sectors are: (1) residential; (2) commercial/institutional; (3) industrial; and (4) public works. This document provides a detailed set of baseline measures for National Construction Goal 2 (reductions in operations, maintenance, and energy costs). As such, it describes data sources, data classifications and hierarchies, and the metrics used to develop the baseline measures. Extensive use of charts and tables is made throughout this document to illustrate the process by which the baseline measures were developed.