FireDOC Search

Author
Chen, P. T.
Title
Preliminary Study of Planned Replacement of Plant and Facility Equipment at the NBS Gaithersburg Site.
Coporate
National Bureau of Standards, Washington, DC
Report
NBSIR 78-1567, November 1978, 25 p.
Distribution
Available from National Technical Information Service
Keywords
building design | building maintenance | budeting process | economic analysis | energy conservation | life cycle costing | rehabilitation cost
Abstract
This preliminary study identifies twenty-two building systems and components as likely candidates for the replacement of the aging and obsolete plant and facility equipment at the National Bureau of Standards, Gaithersburg Site. The study, conducted by the Applied Economics Program, also shows a research plan for future engineering and economic evaluations involving the replacement of plant and facility equipment.