displaying 1 - 10 results in total 16
Winer, H.; Walker, J.; Campbell, P.; Calfee, J.
view article (1.0)Refurbishing "Spray on" Aluminum Enamel on Proximity Clothing. Final Report. October 1982-September 1983.Navy Clothing and Textile Research Facility, Natick, MAAir Force Engineering and Services Center, Tyndall AFB, FL; Naval Air Systems Command, Washington, DC, ESL-TR-84-17, July 1985, 24 p.Beller, R. C.; Ouellette, R. J.; Walker, J. L.; Calfee, J.; Campbell, P.
view article (1.0)AFFF Testing of U.S. Air Force Penetrator Nozzle. Final Report. May 1985-July 1985.Hughes Associates, Inc., Wheaton, MDAir Force Engineering and Services Center, Tyndall Air Force Base, FL; Naval Air Systems Command, Washington, DC, ESL-TR-86-28, May 1986, 15 p.Beaudry, J. P.; Trujillo, T. M.; Zallen, D. M.; Campbell, P.; Walker, J. L.
view article (1.0)Selective Automatic Extinguisher for Computer Cabinets Class A, B, or C With Notification (SAFECOMP). Final Report. October 1984-February 1986.New Mexico Univ., AlbuquerqueAir Force Engineering and Services Center, Tyndall Air Force Base, FL, ESL-TR-86-14; NMERI-WA3-5-(3.01), July 1986, 148 p.Scheffey, J. L.; Jablonski, E. J.; Leonard, J. T.; Walker, J. L.; Campbell, P.
view article (1.0)Fire Performance Evaluation of Solid Aqueous Film-Forming Foam (AFFF). Final Report. April 1984-September 1985.Hughes Associates, Inc., Wheaton, MDESL-TR-85-33, May 1986, 35 p.Tapscott, R. E.; Beeson, H. D.; Lee, M. E.; Plugge, M. A.; Zallen, D. M.; Walker, J. L.; Campbell, P.
view article (1.0)Extinguishing Agent for Magnesium Fire. Phase 1 Through Phase 4. Final Report. January 1985-January 1986.Air Force Engineering and Services Center, Tyndall AFB, FLNaval Air Systems Command, Washington, DC, ESL-TR-86-17, July 1986, 225 p.Myhre, L. G.; Van Kirk, G.; Walker, J. L.; Grimm, W.; Campbell, P.
view article (1.0)Physical Fitness Status of USAF Firefighters. Final Report.USAF School ofAerospace Medicine, Brooks AFB,TXAir Force Engineering and Services Center, Tyndall AFB, FL, ESL-TR-86-05, September 1986, 22 p.Zallen, D. M.; Morehouse, E. T.; Dees, B. R.; Walker, J. L.; Campbell, P.
view article (1.0)Fire Protection System for Hardened Aircraft Shelters. Volume 1 of 3. Discussion and Appendixes A-C. Final Report. October 1984-August 1987.New Mexico Engineering Research Inst., Albuquerque, NMAir Force Engineering and Service Center, Tyndall AFB, FL, ESL-TR-86-13, October 1987, 323 p.Zallen, D. M.; Morehouse, E. T.; Dees, B. R.; Walker, J. L.; Campbell, P.
view article (1.0)Fire Protection System for Hardened Aircraft Shelters. Volume 2 of 3. Appendices D-G. Final Report. October 1984-August 1987.New Mexico Engineering Research Inst., Albuquerque, NMAir Force Engineering and Service Center, Tyndall AFB, FL, ESL-TR-86-13, October 1987, 338 p.Zallen, D. M.; Morehouse, E. T.; Dees, B. R.; Walker, J. L.; Campbell, P.
view article (1.0)Fire Protection System for Hardened Aircraft Shelters. Volume 3 of 3. Appendix H. Final Report. October 1984-August 1987.New Mexico Engineering Research Inst., Albuquerque, NMAir Force Engineering and Service Center, Tyndall AFB, FL, ESL-TR-86-13, October 1987, 35 p.Plugge, M. A.; Tapscott, R. E.; Beeson, H. D.; Zallen, D. M.; Walker, J. L.; Campbell, P.
view article (1.0)Fire Suppression by Halon 2402. Volume 2 of 2. Final Report. September 1984-June 1986.New Mexico Engineering Research Inst., Albuquerque, NMAir Force Engineering and Services Center, Tyndall AFB, FL; Naval Air Systems Command, Washington, DC, ESL-TR-86-60-Vol-1; NMERI-WA3-26-Vol-2, October 1987, 219 p.