displaying 1 - 8 results in total 8
Rorrer, D. E.; Rippey, W. G.; Chang, Y. M.
view article (1.0)HUD Utilities Demonstration Series. Volume 10. Data Reduction Processes for the Jersey City Total Energy Project.National Bureau of Standards, Washington, DCDepartment of Housing and Urban Development, Washington, DC, NBSIR 79-1757, May 1979,Chang, Y. M.; Grot, R. A.
view article (1.0)Technique for Tracking the Effect of Weatherization Retrofits on Low-Income Housing.National Bureau of Standards, Washington, DCCommunity Service Administration, Washington, DC, NBSIR 83-2676, April 1983,Grot, R. A.; Chang, Y. M.; Persily, A. K.; Fang, J. B.
view article (1.0)NBS Thermal Integrity Diagnostic Tests on Eight GSA Federal Office Buildings. Interim Report.National Bureau of Standards, Washington, DCGeneral Services Administration, Washington, DC, NBSIR 83-2768, September 1983,Chang, Y. M.; Grot, R. A.
view article (1.0)Comparative Analysis of Thermographic Inspections Performed on Retrofitted Homes.National Bureau of Standards, Washington, DCDepartment of Energy, Washington, DC, NBSIR 83-2701, May 1983,Chang, Y. M.; Grot, R. A.
view article (1.0)Laboratory Design and Test Procedures for Quantitative Evaluation of Infrared Sensors to Assess Thermal Anomalies.National Bureau of Standards, Gaithersburg, MD; DCS Corp., Alexandria, VADepartment of Energy, Washington, DC, NBSIR 85-3131, June 1985,Grot, R. A.; Persily, A. K.; Chang, Y. M.; Fang, J. B.; Weber, S.
view article (1.0)Evaluation of the Thermal Integrity of the Building Envelopes of Eight Federal Office Buildings.National Bureau of Standards, Gaithersburg, MDGeneral Services Administration, Washington, DC, NBSIR 85-3147, September 1985,Chang, Y. M.; Rorrer, D. E.
view article (1.0)Example of a Numeric and Alphanumeric Technique for Conversion From a Small-Scale Computer to a Large-Scale Computer.National Bureau of Standards, Washington, DCDepartment of Housing and Urban Development, Washington, DC, NBSIR 77-1206, February 1977, 24 p.Chang, Y. M.; Grot, R. A.
view article (1.0)Guidelines to Validate Energy Retrofit Projects.National Bureau of Standards, Gaithersburg, MDAir Force Engineering and Services Center, Tyndall AFB, FL, NBSIR 85-3249, March 1987, 108 p.