FireDOC Search

displaying 1 - 3 results in total 3

  • Broussalian, V. L.; Farrar, A. J.; Lyons, J. W.; Winger, J. H.; Muehlhause, C. O.; Natrella, M. G.; Rosenblatt, J. R.; Stiehler, R. D.
    view article (1.0)

    Considerations in the Use of Sampling Plans for Effecting Compliance With Mandatory Safety Standards. Final Report.
    National Bureau of Standards, Gaithersburg, MD
    NBSIR 75-697, June 1975, 57 p.

  • Stiehler, R. D.; Hockman, A.; Embree, E. J.; Masters, L. W.
    view article (1.0)

    Solar Energy Systems: Standards for Rubber Seals. Final Report.
    National Bureau of Standards, Washington, DC
    Department of Energy, Washington, DC, NBSIR 77-1437, March 1978,

  • Stiehler, R. D.; Michalak, J. L.
    view article (1.0)

    Solar Energy Systems: Standards for Rubber Hose.
    National Bureau of Standards, Washington, DC
    Department of Energy, Washington, DC, NBSIR 79-1917, November 1979,