FireDOC Search

displaying 1 - 10 results in total 10

  • Salley, M. H.; Dreisbach, J.; Hill, K.; Kassawara, R.; Najafi, B.; Joglar, F.; Hamins, A.; McGrattan, K. B.; Peacock, R. D.; Gautier, B.
    view article (1.0)

    Verification and Validation: How to Determine the Accuracy of Fire Models.
    Nuclear Regulatory Commission; Electric Power Research Institute; National Institute of Standards and Technology, Gaithersburg, MD; Electricite de France
    Fire Protection Engineering, No. 34, 34,36,38,40,42,44, Spring 2007

  • Najafi, B.; Joglar, F.; Dreisbach, J.
    view article (1.0)

    Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 1. Main Report.
    Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA; Science Applications International Corp., Los Altos, CA
    ['NUREG-1824', 'EPRI 1011999', 'Volume 1', 'Final Report']
    Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 1; Final Report
    May 2007
    62 p.

  • Hamins, A.; McGrattan, K. B.
    view article (1.0)

    Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 2. Experimental Uncertainty.
    National Institute of Standards and Technology, Gaithersburg, MD
    ['NUREG-1824', 'EPRI 1011999', 'Volume 2', 'Final Report']
    Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 2; Final Report
    May 2007
    105 p.

  • Dreisbach, J.; Hill, K.
    view article (1.0)

    Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 3. FDTs.
    Nuclear Regulatory Commission, Washington, DC
    ['NUREG-1824', 'EPRI 1011999', 'Volume 3', 'Final Report']
    Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 3; Final Report
    May 2007
    118 p.

  • Joglar, F.
    view article (1.0)

    Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 4. Fire-Induced Vulnerability Evaluation (FIVE-Rev1).
    Electric Power Research Institute, Palo Alto, CA
    ['NUREG-1824', 'EPRI 1011999', 'Volume 4', 'Final Report']
    Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 4; Final Report
    May 2007
    100 p.

  • Peacock, R. D.; Reneke, P. A.
    view article (1.0)

    Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 5. Consolidated Fire Growth and Smoke Transport Model (CFAST).
    National Institute of Standards and Technology, Gaithersburg, MD
    ['NUREG-1824', 'EPRI 1011999', 'Volume 5', 'Final Report']
    Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 5; Final Report
    May 2007
    206 p.

  • Joglar, F.; Gautier, B.; Gay, L.; Texeraud, J.
    view article (1.0)

    Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 6. MAGIC.
    Electric Power Research Institute, Palo Alto, CA
    ['NUREG-1824', 'EPRI 1011999', 'Volume 6', 'Final Report']
    Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 6; Final Report
    May 2007
    206 p.

  • McGrattan, K. B.
    view article (1.0)

    Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 7. Fire Dynamics Simulator (FDS).
    National Institute of Standards and Technology, Gaithersburg, MD
    ['NUREG-1824', 'EPRI 1011999', 'Volume 7', 'Final Report']
    Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA, NUREG-1824; EPRI 1011999; Volume 7; Final Report
    May 2007
    205 p.

  • Schulte, R.
    view article (1.0)

    Standard Engineering Practice or Junk Science?
    Plumbing Engineer, Vol. 36, No. 7, 28,32,36,38,40,42, July 2008

  • Jones, W. W.; Peacock, R. D.; Forney, G. P.; Reneke, P. A.
    view article (1.0)

    CFAST: Consolidated Model of Fire Growth and Smoke Transport (Version 6). Technical Reference Guide.
    National Institute of Standards and Technology, Gaithersburg, MD
    ['NIST SP 1026', 'NIST Special Publication 1026', 'Version 6', 'Technical Reference Guide']
    NIST SP 1026; NIST Special Publication 1026; Version 6; Technical Reference Guide
    April 2009 (Revision)
    117 p.