Fleming, R. P.
view article (9.588148)
Dangers of Performance-Based Codes.
National Fire Sprinkler Assoc., Patterson, NY
Sprinkler Quarterly,
No. 105,
34,36,
Winter 1998
Kassawara, R. P.; Hyslop, J. S.
view article (9.588148)
Fire PRA Methodology for Nuclear Power Facilities. Volume 2. Detailed Methodology. Preliminary Report.
Electric Power Research Institute, Palo Alto, CA; Nuclear Regulatory Commission, Washington, DC
EPRI 1008239; NUREG/CR-6850; Volume 2,
October 2004,
620 p.
Najafi, B.; Joglar, F.; Dreisbach, J.
view article (9.299347)
Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 1. Main Report.
Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA; Science Applications International Corp., Los Altos, CA
Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA,
NUREG-1824; EPRI 1011999; Volume 1; Final Report,
May 2007,
62 p.
Joglar, F.; Gautier, B.; Gay, L.; Texeraud, J.
view article (9.299347)
Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 6. MAGIC.
Electric Power Research Institute, Palo Alto, CA
Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA,
NUREG-1824; EPRI 1011999; Volume 6; Final Report,
May 2007,
206 p.
McGrattan, K. B.
view article (9.299347)
Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 7. Fire Dynamics Simulator (FDS).
National Institute of Standards and Technology, Gaithersburg, MD
Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA,
NUREG-1824; EPRI 1011999; Volume 7; Final Report,
May 2007,
205 p.
Nicholson, J.
view article (9.292924)
Looking Up.
NFPA Journal,
Vol. 97,
No. 3,
90-94,
May/June 2003
Dreisbach, J.; Hill, K.
view article (9.292924)
Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 3. FDTs.
Nuclear Regulatory Commission, Washington, DC
Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA,
NUREG-1824; EPRI 1011999; Volume 3; Final Report,
May 2007,
118 p.
Peacock, R. D.; Reneke, P. A.
view article (9.292924)
Verification and Validation of Selected Fire Models for Nuclear Power Plant Applications. Volume 5. Consolidated Fire Growth and Smoke Transport Model (CFAST).
National Institute of Standards and Technology, Gaithersburg, MD
Nuclear Regulatory Commission, Washington, DC; Electric Power Research Institute, Palo Alto, CA,
NUREG-1824; EPRI 1011999; Volume 5; Final Report,
May 2007,
206 p.
Beller, D.
view article (9.081846)
Performance-Based Codes and Standards at NFPA: How Far We Have Come.
National Fire Protection Association, Quincy, MA
Fire Safety Design in the 21st Century, Second (2nd) Conference. Pre-Conference Papers. Worcester Polytechnic Institute. June 9-11, 1999,
Worcester, MA,
21-34 p.,
1991
Salley, M. H.; Dreisbach, J.; Hill, K.; Kassawara, R.; Najafi, B.; Joglar, F.; Hamins, A.; McGrattan, K. B.; Peacock, R. D.; Gautier, B.
view article (9.081846)
Verification and Validation: How to Determine the Accuracy of Fire Models.
Nuclear Regulatory Commission; Electric Power Research Institute; National Institute of Standards and Technology, Gaithersburg, MD; Electricite de France
Fire Protection Engineering,
No. 34,
34,36,38,40,42,44,
Spring 2007