FireDOC Search

displaying 1 - 2 results in total 2

  • National Bureau of Standards
    view article (1.0)

    Guide Criteria for the Design and Evaluation of: Operation Breakthrough. Housing Systems. A Preliminary Report. Volume 2. Multifamily Low Rise. 4 Volumes. (Supersedes NBS Report 10 100 dated March 1, 1970.)
    National Bureau of Standards, Gaithersburg, MD
    NBS 10 200
    NBS 10 200
    September 1, 1970
    400 p.

  • National Bureau of Standards
    view article (1.0)

    Guide Criteria for the Design and Evaluation of: Operation Breakthrough. Housing Systems. A Preliminary Report. Volume 1. Multifamily High Rise. 4 Volumes. (Supersedes NBS Report 10 200 Dated March 1, 1970).
    National Bureau of Standards, Gaithersburg, MD
    NBS 10 200
    NBS 10 200
    September 1, 1970
    400 p.