Cheok, G. S.; Lew, H. S.
view article (1.0)
Performance of 1/-3-Scale Model Precast Concrete Beam-Column Connections Subjected to Cyclic Inelastic Loads.
National Institute of Standards and Technology, Gaithersburg, MD
NISTIR 4433,
October 1990,
104 p.
Cheok, G. S.; Lew, H. S.
view article (1.0)
Seismic Performance of 1/3 Scale Post-Tensioned Precast Beam-Column Connections.
National Institute of Standards and Technology, Gaithersburg, MD
Earthquake Engineering Research Institute. U.S. National Conference on Earthquake Engineering, 4th. Volume 2. May 20-24, 1990,
Earthquake Engineering Res. Inst., El Cerrito, CA,
Palm Springs, CA,
757-766 p.,
1990
Cheok, G. S.; Lew, H. S.
view article (1.0)
Performance of 1/-3-Scale Model Precast Concrete Beam-Column Connections Subjected to Cyclic Inelastic Loads. Report No. 2.
National Institute of Standards and Technology, Gaithersburg, MD
NISTIR 4589,
June 1991,
84 p.
Schultz, A. E.; Magana, R. A.; Tadros, M. K.; Huo, X. M.
view article (1.0)
Experimental Study of Joint Connections in Precast Concrete Walls.
National Institute of Standards and Technology, Gaithersburg, MD; LEAP Associates International, Inc., Tampa, FL; University of Nebraska-Lincoln, Omaha
Earthquake Engineering Research Institute. Earthquake Awareness and Mitigation Across the Nation. U.S. National Conference, Fifth (5th). Proceedings. Volume 2. July 10-14, 1994,
Chicago, IL,
579-587 p.,
1994